Camster wind farm

Camster is an onshore wind farm in Highland, Scotland with 50 MW of capacity. In 2025 it generated 139 GWh, a load factor of 32%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since April 2022.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Camster since 2022: every month and year

Elexon's metered record for Camster's unit starts on 14 April 2022, and runs to 24 October 2026. In that time it has generated 664 GWh. Its busiest whole year was 2024, at a load factor of 35%. Its best day was 19 November 2022, when it generated 1,168 MWh, 49 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 50 MW. Hover over or tap a bar for the month’s figures.
Camster's metered output by year
YearGeneratedLoad factor
2026to 24 Oct129 GWh36%
2025139 GWh32%
2024155 GWh35%
2023138 GWh31%
2022from 14 Apr104 GWh31%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, 2__PEDGE003, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Camster

Camster is an onshore wind farm in Highland, Scotland, with 50 MW of generating capacity across one balancing mechanism unit: Elexon registers it at 56 MW, but RWE gives it 50 MW, and that is the capacity this page uses. It is the 99th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026 for the chart.

The government's Renewable Energy Planning Database lists Camster as operational since February 2013, with 25 turbines of 2 MW.

Camster
Where Camster is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Capacity50 MW (RWE)
Registered capacity56 MW (Elexon)
Turbines25 turbines of 2 MW
Operational sinceFebruary 2013
LocationHighland, Scotland
Grid regionNorth Scotland
Owner groupRWE (operator or majority owner; joint ventures simplified)
Operator in REPDE.ON UK
Elexon lead partyEdgware Energy Limited
BM unit 2__PEDGE003 56 MW
Size99th largest of 163

Download and cite

Camster daily output (CSV)

Every finished UK day GridMonkey has recorded for Camster, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Camster Wind Farm: Live Output and History Since 2022. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/camster/ (Accessed: [date]).

Other RWE wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since April 2022 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.