Camster II wind farm

What Camster II is generating right now, and over the last week: live from Elexon, the GB electricity market's data service.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Camster II

Camster II is an onshore wind farm in Highland, Scotland, with 36 MW of registered generating capacity across one balancing mechanism unit. It is the 126th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Camster II as operational since April 2026, with 10 turbines of 3.6 MW, up to 127 m tall to the blade tip.

Camster II
Where Camster II is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity36 MW
Turbines10 turbines of 3.6 MW
Height to blade tip127 m
Operational sinceApril 2026
LocationHighland, Scotland
Grid regionNorth Scotland
Owner groupRWE (operator or majority owner; joint ventures simplified)
Operator in REPDE.ON UK
Elexon lead partyEdgware Energy Limited
BM unit E_CMSTW-2 36 MW
Size126th largest of 163

Other RWE wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.