Camster II wind farm

Camster II is an onshore wind farm in Highland, Scotland with 36 MW of registered capacity. In 2026 so far (to 24 Oct) it generated 45.4 GWh, a load factor of 18%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since December 2025.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Camster II since 2025: every month and year

Elexon's metered record for Camster II's unit starts on 17 December 2025, and runs to 24 October 2026. In that time it has generated 45.4 GWh. Its best day was 5 April 2026, when it generated 705 MWh, 29 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 36 MW. Hover over or tap a bar for the month’s figures.
Camster II's metered output by year
YearGeneratedLoad factor
2026to 24 Oct45.4 GWh18%
2025from 17 Dec0 MWh0%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_CMSTW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Camster II

Camster II is an onshore wind farm in Highland, Scotland, with 36 MW of registered generating capacity across one balancing mechanism unit. It is the 127th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Camster II as operational since April 2026, with 10 turbines of 3.6 MW, up to 127 m tall to the blade tip.

Camster II
Where Camster II is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity36 MW
Turbines10 turbines of 3.6 MW
Height to blade tip127 m
Operational sinceApril 2026
LocationHighland, Scotland
Grid regionNorth Scotland
Owner groupRWE (operator or majority owner; joint ventures simplified)
Operator in REPDE.ON UK
Elexon lead partyEdgware Energy Limited
BM unit E_CMSTW-2 36 MW
Size127th largest of 163

Download and cite

Camster II daily output (CSV)

Every finished UK day GridMonkey has recorded for Camster II, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Camster II Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/camster-ii/ (Accessed: [date]).

Other RWE wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since December 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.