Output over the last 7 days
About Camster II
Camster II is an onshore wind farm in Highland, Scotland, with 36 MW of registered generating capacity across one balancing mechanism unit. It is the 126th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Camster II as operational since April 2026, with 10 turbines of 3.6 MW, up to 127 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 36 MW |
| Turbines | 10 turbines of 3.6 MW |
| Height to blade tip | 127 m |
| Operational since | April 2026 |
| Location | Highland, Scotland |
| Grid region | North Scotland |
| Owner group | RWE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | E.ON UK |
| Elexon lead party | Edgware Energy Limited |
| BM unit | E_CMSTW-2 36 MW |
| Size | 126th largest of 163 |
Other RWE wind farms
- Sofia offshore, 1,400 MW
- Triton Knoll offshore, 824 MW
- London Array offshore, 630 MW
- Gwynt y Môr offshore, 592 MW
- Rampion offshore, 400 MW
- Galloper offshore, 353 MW
- Humber Gateway offshore, 219 MW
- Robin Rigg offshore, 174 MW
- Enoch Hill onshore, 70 MW
- Camster onshore, 50 MW
More wind farms in North Scotland
- Mid Hill onshore, 76 MW
- Braes of Doune onshore, 74 MW
- Paul's Hill onshore, 70 MW
- Berry Burn onshore, 63 MW
- Moy onshore, 60 MW
- Rothes onshore, 55 MW
- Baillie onshore, 53 MW
- Beinn an Tuirc III onshore, 52 MW
- Kincardine offshore, 50 MW
- Causeymire onshore, 48 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.