Elexon's metered record for Sofia's units starts on 19 December 2025, and runs to 24 October 2026. In that time it has generated 288 GWh. Its best day was 20 October 2026, when it generated 17,802 MWh, 742 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 288 GWh | 3% |
| 2025from 19 Dec | 0 MWh | 0% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 4 units (T_SOFOW-11, T_SOFOW-12, T_SOFOW-21, T_SOFOW-22), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Sofia
Sofia is an offshore wind farm off the coast of England, with 1,400 MW of generating capacity across 4 balancing mechanism units: Elexon registers them at 1,828 MW in all, but RWE gives it 1,400 MW, and that is the capacity this page uses. It is the largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
Sofia is still being commissioned: RWE finished installing its 100 turbines in June 2026 and its first power reached the grid on 18 September 2026, and RWE has said its commissioning is due in 2026. The league table lists it without a rank until it is running in full.
The government's Renewable Energy Planning Database lists Sofia as under construction in the July 2026 edition, with 100 turbines, up to 252 m tall to the blade tip.
| Type | Offshore wind farm |
|---|---|
| Capacity | 1,400 MW (RWE) |
| Registered capacity | 1,828 MW (Elexon) |
| Turbines | 100 turbines |
| Height to blade tip | 252 m |
| Status now | Not yet running in full (RWE; Elexon) |
| Status | Under construction (REPD, July 2026) |
| Location | Off the coast of England |
| Owner group | RWE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | RWE Renewables UK |
| Elexon lead party | Sofia Offshore Wind Farm Ltd |
| BM units | T_SOFOW-11 457 MW, T_SOFOW-12 457 MW, T_SOFOW-21 457 MW, T_SOFOW-22 457 MW |
| Size | Largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Sofia, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Sofia Wind Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/sofia/ (Accessed: [date]).
Other RWE wind farms
- Triton Knoll offshore, 824 MW
- London Array offshore, 630 MW
- Gwynt y Môr offshore, 592 MW
- Rampion offshore, 400 MW
- Galloper offshore, 353 MW
- Humber Gateway offshore, 219 MW
- Robin Rigg offshore, 174 MW
- Enoch Hill onshore, 70 MW
- Camster onshore, 50 MW
- Camster II onshore, 36 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since December 2025 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.