Loading the live figure from Elexon…
Output over the last 7 days
Humber Gateway since 2019: every month and year
Elexon's metered record for Humber Gateway's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 6.3 TWh. Its busiest whole year was 2020, at a load factor of 47%. Its best day was 18 December 2020, when it generated 5,199 MWh, 217 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 629 GWh | 40% |
| 2025 | 826 GWh | 43% |
| 2024 | 811 GWh | 42% |
| 2023 | 786 GWh | 41% |
| 2022 | 836 GWh | 44% |
| 2021 | 755 GWh | 39% |
| 2020 | 894 GWh | 47% |
| 2019from 1 Feb | 747 GWh | 43% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_HMGTO-1, T_HMGTO-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Humber Gateway
Humber Gateway is an offshore wind farm off the coast of England, with 219 MW of registered generating capacity across 2 balancing mechanism units. It is the 38th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Humber Gateway as operational since May 2015, with 73 turbines of 3 MW.
| Type | Offshore wind farm |
|---|---|
| Registered capacity | 219 MW |
| Turbines | 73 turbines of 3 MW |
| Operational since | May 2015 |
| Location | Off the coast of England |
| Owner group | RWE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | E.ON Humber Wind |
| Elexon lead party | RWE Renewables UK Humber Wind |
| BM units | T_HMGTO-1 108 MW, T_HMGTO-2 111 MW |
| Size | 38th largest of 163 |
Download and cite
Humber Gateway daily output (CSV)
Every finished UK day GridMonkey has recorded for Humber Gateway, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Humber Gateway Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/humber-gateway/ (Accessed: [date]).
Other RWE wind farms
- Sofia offshore, 1,400 MW
- Triton Knoll offshore, 824 MW
- London Array offshore, 630 MW
- Gwynt y Môr offshore, 592 MW
- Rampion offshore, 400 MW
- Galloper offshore, 353 MW
- Robin Rigg offshore, 174 MW
- Enoch Hill onshore, 70 MW
- Camster onshore, 50 MW
- Camster II onshore, 36 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.