Elexon's metered record for Triton Knoll's units starts on 6 October 2020, and runs to 24 October 2026. In that time it has generated 14.4 TWh. Its busiest whole year was 2024, at a load factor of 43%. Its best day was 17 December 2023, when it generated 19,575 MWh, 816 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 2.3 TWh | 39% |
| 2025 | 2.8 TWh | 38% |
| 2024 | 3.1 TWh | 43% |
| 2023 | 3.0 TWh | 42% |
| 2022 | 2.4 TWh | 33% |
| 2021 | 814 GWh | 11% |
| 2020from 6 Oct | 0 MWh | 0% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_TKNEW-1, T_TKNWW-1), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Triton Knoll
Triton Knoll is an offshore wind farm off the coast of England, with 824 MW of registered generating capacity across 2 balancing mechanism units. It is the 10th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by RWE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Triton Knoll as operational since January 2022, with 90 turbines of 9.5 MW, up to 187 m tall to the blade tip.
| Type | Offshore wind farm |
|---|---|
| Registered capacity | 824 MW |
| Turbines | 90 turbines of 9.5 MW |
| Height to blade tip | 187 m |
| Operational since | January 2022 |
| Location | Off the coast of England |
| Owner group | RWE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Innogy |
| Elexon lead party | Triton Knoll Offshore Wind |
| BM units | T_TKNEW-1 412 MW, T_TKNWW-1 412 MW |
| Size | 10th largest of 163 |
Download and cite
Triton Knoll daily output (CSV)
Every finished UK day GridMonkey has recorded for Triton Knoll, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Triton Knoll Wind Farm: Live Output and History Since 2020. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/triton-knoll/ (Accessed: [date]).
Other RWE wind farms
- Sofia offshore, 1,400 MW
- London Array offshore, 630 MW
- Gwynt y Môr offshore, 592 MW
- Rampion offshore, 400 MW
- Galloper offshore, 353 MW
- Humber Gateway offshore, 219 MW
- Robin Rigg offshore, 174 MW
- Enoch Hill onshore, 70 MW
- Camster onshore, 50 MW
- Camster II onshore, 36 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2020 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.