Checking Elexon for Moriston hydro scheme's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
About Moriston hydro scheme
Moriston hydro scheme is a group of hydro stations in Glen Moriston in the Highlands. Its three stations, Glenmoriston, Ceannacroc and Livishie, were commissioned between 1956 and 1962. Its stations are traded as one unit, so their output shows here as one.
Its 74 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Hydro stations run on rivers and reservoirs, most of them in the Scottish Highlands. How much they generate depends on the rain and on when the grid needs them.
| Type | Hydro |
|---|---|
| Registered capacity | 74 MW |
| Stations commissioned | 1956–1962 (DUKES 5.11) |
| Its stations | Glenmoriston, Ceannacroc and Livishie |
| Area | Highland |
| Location | In Glen Moriston in the Highlands 57.176° N, 4.799° W |
| Owner or operator | SSE |
| Elexon lead party | SSE Generation Ltd |
| BM unit | M_CAS-MOR01 74 MW |
| Size | 8th largest of the 15 hydro power stations on GridMonkey's list |
Other hydro power stations
- Sloy 153 MW, Argyll and Bute
- Glendoe 100 MW, Highland
- Conon hydro scheme 95 MW, Highland
- Beauly hydro scheme 94 MW, Highland
- Lochaber 80 MW, Highland
- Clunie hydro scheme 76 MW, Perth and Kinross
- Errochty 76 MW, Perth and Kinross
- Fasnakyle 69 MW, Highland
- Killin hydro scheme 63 MW, Stirling and Perth and Kinross
- Rheidol hydro scheme 50 MW, Ceredigion
- Clachan 43 MW, Argyll and Bute
- Garry hydro scheme 40 MW, Highland
All 158 power stations, live → Power station league table → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's output here is its physical notification, not metered generation. Stations, years commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.