Output over the last 7 days
Glendoe since 2019: every month and year
Elexon's metered record for Glendoe's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.3 TWh. Its busiest whole year was 2020, at a load factor of 26%. Its best day was 5 November 2022, when it generated 2,370 MWh, 99 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 118 GWh | 16% | 146 |
| 2025 | 147 GWh | 17% | 269 |
| 2024 | 184 GWh | 21% | 271 |
| 2023 | 176 GWh | 20% | 260 |
| 2022 | 164 GWh | 19% | 235 |
| 2021 | 161 GWh | 18% | 244 |
| 2020 | 231 GWh | 26% | 301 |
| 2019from 1 Feb | 161 GWh | 20% | 279 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_GLNDO-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Glendoe
Glendoe is a hydro power station near Fort Augustus in the Highlands. It was commissioned in 2008.
Its 100 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Hydro stations run on rivers and reservoirs, most of them in the Scottish Highlands. How much they generate depends on the rain and on when the grid needs them.
| Type | Hydro |
|---|---|
| Registered capacity | 100 MW |
| Commissioned | 2008 (DUKES 5.11) |
| Area | Highland |
| Location | Near Fort Augustus in the Highlands 57.142° N, 4.667° W |
| Owner or operator | SSE |
| Elexon lead party | SSE Generation Ltd |
| BM unit | T_GLNDO-1 100 MW |
| Size | 2nd largest of the 15 hydro power stations on GridMonkey's list |
Download and cite
Every finished UK day GridMonkey has recorded for Glendoe, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Glendoe Hydro Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/glendoe/ (Accessed: [date]).
Other hydro power stations
- Sloy 153 MW, Argyll and Bute
- Conon hydro scheme 95 MW, Highland
- Beauly hydro scheme 94 MW, Highland
- Lochaber 80 MW, Highland
- Clunie hydro scheme 76 MW, Perth and Kinross
- Errochty 76 MW, Perth and Kinross
- Moriston hydro scheme 74 MW, Highland
- Fasnakyle 69 MW, Highland
- Killin hydro scheme 63 MW, Stirling and Perth and Kinross
- Rheidol hydro scheme 50 MW, Ceredigion
- Clachan 43 MW, Argyll and Bute
- Garry hydro scheme 40 MW, Highland
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Year commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.