Checking the operators' outage notices…
Nuclear
Britain's 5 nuclear power stations, unit by unit (10 units, 6,410 MW): what each is generating this half hour, and any outage notice.
| Station | Unit | Generating now |
|---|---|---|
| Torness | TORN-1 … | – |
| Torness | TORN-2 … | – |
| Heysham 2 | HEYM27 … | – |
| Heysham 2 | HEYM28 … | – |
| Sizewell B | SIZB-1 … | – |
| Sizewell B | SIZB-2 … | – |
| Hartlepool | HRTL-1 … | – |
| Hartlepool | HRTL-2 … | – |
| Heysham 1 | HEYM11 … | – |
| Heysham 1 | HEYM12 … | – |
Interconnectors
Britain's 10 cables to its neighbours. A cable's operator can limit what it carries, in either direction or both.
| Cable | Outage notice |
|---|---|
| IFA | … |
| IFA2 | … |
| ElecLink | … |
| BritNed | … |
| Nemo Link | … |
| North Sea Link | … |
| Viking Link | … |
| Moyle | … |
| East West | … |
| Greenlink | … |
Other power stations and farms out or limited now
Most MW out first. A unit may be fully out or able to run only part of its capacity.
Loading…
Due in the next 7 days
Notices that start within the next week, soonest first. Many gas stations notify overnight shutdowns this way.
Loading…
About these notices
When a generating unit or an interconnector is out or limited, its operator publishes a notice: whether it was planned, how many MW are available, when it started and when they expect it to end, and usually a reason. These notices (under REMIT, the rules on energy market transparency) are published through Elexon, the GB electricity market's data service. Large units must publish them; many smaller ones do too.
GridMonkey checks for new notices every 15 minutes and shows those for the power stations, wind farms, solar farms and cables on its own lists. The end times are the operators' estimates and often move. Some notices change over their course, such as one for a gas station notified out only overnight: each is shown while it limits the unit, and its next spell as due. A unit can also be off for no reason that needs a notice, such as not being needed by the market, so a station with no notice isn't necessarily running: each station's page shows what it is actually doing this half hour. The two can differ for a while, too: a unit's output is what it has told the grid it is running at this half hour, and its notice what its operator has said it can make available.
Every power station, live → Every wind farm, live → Britain's interconnectors →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Outage notices are the operators' own; GridMonkey shows them as published.