Lochaber hydro power station

Lochaber is an 80 MW hydro power station at Fort William in the Highlands. In 2025 it generated 85 GWh and ran on 318 days, a load factor of 12%. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since September 2019.

Checking Elexon for Lochaber's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Lochaber since 2019: every month and year

Elexon's metered record for Lochaber's unit starts on 6 September 2019, and runs to 24 October 2026. In that time it has generated 551 GWh. Its busiest whole year was 2024, at a load factor of 16%. Its best day was 25 November 2022, when it generated 685 MWh, 29 MW on average.

Its average output each month, in MW. Its capacity today is 80 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Lochaber's metered output by year
YearGeneratedLoad factorDays it ran
2026to 24 Oct57.4 GWh10%241
202585 GWh12%318
2024114 GWh16%350
202388.1 GWh13%292
202283.9 GWh12%313
202134 GWh5%214
202070.4 GWh10%330
2019from 6 Sep18.2 GWh8%106

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, 2__PMARB001, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Lochaber

Lochaber is a hydro power station at Fort William in the Highlands.

Its 80 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Hydro stations run on rivers and reservoirs, most of them in the Scottish Highlands. How much they generate depends on the rain and on when the grid needs them.

Lochaber
Where Lochaber is. From its REPD location. Map outline: Natural Earth.
TypeHydro
Registered capacity80 MW
AreaHighland
LocationAt Fort William in the Highlands
56.829° N, 5.073° W
Operator in REPDGFG Alliance (REPD)
Elexon lead partyMarble Power Limited
BM unit 2__PMARB001 80 MW
Size5th largest of the 15 hydro power stations on GridMonkey's list

Download and cite

Lochaber daily output (CSV)

Every finished UK day GridMonkey has recorded for Lochaber, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Lochaber Hydro Power Station: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/lochaber/ (Accessed: [date]).

Other hydro power stations

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and areas come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since September 2019 is its metered output (B1610). Operator and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.