Garry hydro scheme

Garry hydro scheme is a 40 MW group of hydro stations in Glen Garry in the Highlands, operated or mostly owned by SSE. In 2025 it generated 185 GWh and ran on 360 days, a load factor of 53%. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.

Checking Elexon for Garry hydro scheme's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Garry hydro scheme since 2019: every month and year

Elexon's metered record for Garry hydro scheme's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.4 TWh. Its busiest whole year was 2020, at a load factor of 59%. Its best day was 20 March 2020, when it generated 909 MWh, 38 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 40 MW. Hover over or tap a bar for the month’s figures.
Garry hydro scheme's metered output by year
YearGeneratedLoad factorDays it ran
2026to 24 Oct153 GWh54%279
2025185 GWh53%360
2024178 GWh51%347
2023146 GWh42%338
2022174 GWh50%339
2021170 GWh49%355
2020207 GWh59%358
2019from 1 Feb168 GWh52%320

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, M_CAS-GAR01, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Garry hydro scheme

Garry hydro scheme is a group of hydro stations in Glen Garry in the Highlands. Its two stations, Quoich and Invergarry, were commissioned in 1955 and 1956. Its stations are traded as one unit, so their output shows here as one.

Its 40 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Hydro stations run on rivers and reservoirs, most of them in the Scottish Highlands. How much they generate depends on the rain and on when the grid needs them.

Garry hydro scheme
Where Garry hydro scheme is. From its grid reference in DUKES 5.11. Map outline: Natural Earth.
TypeHydro
Registered capacity40 MW
Stations commissioned1955–1956 (DUKES 5.11)
Its stationsQuoich and Invergarry
AreaHighland
LocationIn Glen Garry in the Highlands
57.072° N, 4.774° W
Owner or operatorSSE
Elexon lead partySSE Generation Ltd
BM unit M_CAS-GAR01 40 MW
Size13th largest of the 15 hydro power stations on GridMonkey's list

Download and cite

Garry hydro scheme daily output (CSV)

Every finished UK day GridMonkey has recorded for Garry hydro scheme, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Garry Hydro Scheme: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/garry-hydro-scheme/ (Accessed: [date]).

Other hydro power stations

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Stations, years commissioned and location: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.