Output over the last 7 days
Killin hydro scheme since 2019: every month and year
Elexon's metered record for Killin hydro scheme's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.4 TWh. Its busiest whole year was 2020, at a load factor of 47%. Its best day was 1 December 2022, when it generated 1,419 MWh, 59 MW on average.
| Year | Generated | Load factor | Days it ran |
|---|---|---|---|
| 2026to 24 Oct | 111 GWh | 25% | 276 |
| 2025 | 94.2 GWh | 17% | 246 |
| 2024 | 192 GWh | 35% | 332 |
| 2023 | 194 GWh | 35% | 364 |
| 2022 | 203 GWh | 37% | 365 |
| 2021 | 168 GWh | 30% | 357 |
| 2020 | 259 GWh | 47% | 365 |
| 2019from 1 Feb | 175 GWh | 35% | 329 |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, M_CAS-KIL01, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it ran if it generated at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Killin hydro scheme
Killin hydro scheme is a group of hydro stations in Glen Lyon and Glen Lochay, west of Killin. Its three stations, Lubreoch, Cashlie and Lochay, were commissioned in 1958 and 1959. Its stations are traded as one unit, so their output shows here as one.
Elexon registers its one balancing mechanism unit at 70 MW, but DUKES 5.11, the government's list of power stations, gives it 63 MW, and that is the capacity this page uses. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Hydro stations run on rivers and reservoirs, most of them in the Scottish Highlands. How much they generate depends on the rain and on when the grid needs them.
| Type | Hydro |
|---|---|
| Capacity | 63 MW (DUKES 5.11) |
| Registered capacity | 70 MW (Elexon) |
| Stations commissioned | 1958–1959 (DUKES 5.11) |
| Its stations | Lubreoch, Cashlie and Lochay |
| Area | Stirling and Perth and Kinross |
| Location | In Glen Lyon and Glen Lochay, west of Killin 56.485° N, 4.364° W |
| Owner or operator | SSE |
| Elexon lead party | SSE Generation Ltd |
| BM unit | M_CAS-KIL01 70 MW |
| Size | 10th largest of the 15 hydro power stations on GridMonkey's list |
Download and cite
Killin hydro scheme daily output (CSV)
Every finished UK day GridMonkey has recorded for Killin hydro scheme, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Killin Hydro Scheme: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/killin-hydro-scheme/ (Accessed: [date]).
Other hydro power stations
- Sloy 153 MW, Argyll and Bute
- Glendoe 100 MW, Highland
- Conon hydro scheme 95 MW, Highland
- Beauly hydro scheme 94 MW, Highland
- Lochaber 80 MW, Highland
- Clunie hydro scheme 76 MW, Perth and Kinross
- Errochty 76 MW, Perth and Kinross
- Moriston hydro scheme 74 MW, Highland
- Fasnakyle 69 MW, Highland
- Rheidol hydro scheme 50 MW, Ceredigion
- Clachan 43 MW, Argyll and Bute
- Garry hydro scheme 40 MW, Highland
All 158 power stations, live → Power station league table → Power station outages now → Every wind farm, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Capacity, stations and years commissioned: Power stations in the United Kingdom (DUKES 5.11) (Department for Energy Security and Net Zero, May 2026). Contains public sector information licensed under the Open Government Licence v3.0. Map position: © OpenStreetMap contributors.