Tom nan Clach wind farm

Tom nan Clach is an onshore wind farm in Highland, Scotland with 40 MW of registered capacity. In 2025 it generated 121 GWh, a load factor of 35%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since June 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Tom nan Clach since 2019: every month and year

Elexon's metered record for Tom nan Clach's unit starts on 1 June 2019, and runs to 24 October 2026. In that time it has generated 891 GWh. Its busiest whole year was 2022, at a load factor of 44%. Its best day was 22 October 2019, when it generated 945 MWh, 39 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 40 MW. Hover over or tap a bar for the month’s figures.
Tom nan Clach's metered output by year
YearGeneratedLoad factor
2026to 24 Oct92.6 GWh32%
2025121 GWh35%
2024104 GWh30%
2023106 GWh30%
2022153 GWh44%
2021126 GWh36%
2020141 GWh40%
2019from 1 Jun48.4 GWh24%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, C__PSTAT011, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Tom nan Clach

Tom nan Clach is an onshore wind farm in Highland, Scotland, with 40 MW of registered generating capacity across one balancing mechanism unit. It is the 117th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Greencoat UK Wind. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026 for the chart.

The government's Renewable Energy Planning Database lists Tom nan Clach as operational since March 2019, with 13 turbines of 3 MW, up to 125 m tall to the blade tip.

Tom nan Clach
Where Tom nan Clach is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity40 MW
Turbines13 turbines of 3 MW
Height to blade tip125 m
Operational sinceMarch 2019
LocationHighland, Scotland
Grid regionNorth Scotland
Owner groupGreencoat UK Wind (operator or majority owner; joint ventures simplified)
Operator in REPDInfinergy
Elexon lead partyStatkraft Markets Gmbh
BM unit C__PSTAT011 40 MW
Size117th largest of 163

Download and cite

Tom nan Clach daily output (CSV)

Every finished UK day GridMonkey has recorded for Tom nan Clach, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Tom nan Clach Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/tom-nan-clach/ (Accessed: [date]).

Other Greencoat UK Wind wind farms

More wind farms in North Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since June 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live