Twenty Shilling wind farm

Twenty Shilling is an onshore wind farm in Dumfries and Galloway, Scotland with 38 MW of registered capacity. In 2025 it generated 85.5 GWh, a load factor of 26%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since September 2021.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Twenty Shilling since 2021: every month and year

Elexon's metered record for Twenty Shilling's unit starts on 23 September 2021, and runs to 24 October 2026. In that time it has generated 480 GWh. Its busiest whole year was 2022, at a load factor of 35%. Its best day was 6 February 2022, when it generated 868 MWh, 36 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 38 MW. Hover over or tap a bar for the month’s figures.
Twenty Shilling's metered output by year
YearGeneratedLoad factor
2026to 24 Oct76 GWh28%
202585.5 GWh26%
202497.6 GWh29%
202394.4 GWh28%
2022115 GWh35%
2021from 23 Sep11.4 GWh12%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_TWSHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Twenty Shilling

Twenty Shilling is an onshore wind farm in Dumfries and Galloway, Scotland, with 38 MW of registered generating capacity across one balancing mechanism unit. It is the 124th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Greencoat UK Wind. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Twenty Shilling as under construction in the July 2026 edition (it may already be generating some of its output), with 9 turbines, up to 82 m tall to the blade tip.

Twenty Shilling
Where Twenty Shilling is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity38 MW
Turbines9 turbines
Height to blade tip82 m
StatusUnder construction (REPD, July 2026)
LocationDumfries and Galloway, Scotland
Owner groupGreencoat UK Wind (operator or majority owner; joint ventures simplified)
Operator in REPDElement Power
Elexon lead partyTwentyshilling Limited
BM unit T_TWSHW-1 38 MW
Size124th largest of 163

Download and cite

Twenty Shilling daily output (CSV)

Every finished UK day GridMonkey has recorded for Twenty Shilling, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Twenty Shilling Wind Farm: Live Output and History Since 2021. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/twenty-shilling/ (Accessed: [date]).

Other Greencoat UK Wind wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since September 2021 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.