Assel Valley wind farm

Assel Valley is an onshore wind farm in Strathclyde, Scotland with 26 MW of registered capacity. In 2025 it generated 68.4 GWh, a load factor of 30%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Assel Valley since 2019: every month and year

Elexon's metered record for Assel Valley's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 534 GWh. Its busiest whole year was 2020, at a load factor of 34%. Its best day was 17 February 2019, when it generated 598 MWh, 25 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 26 MW. Hover over or tap a bar for the month’s figures.
Assel Valley's metered output by year
YearGeneratedLoad factor
2026to 24 Oct64.5 GWh35%
202568.4 GWh30%
202463.2 GWh28%
202362.6 GWh27%
202269.1 GWh30%
202159.5 GWh26%
202077.5 GWh34%
2019from 1 Feb69.5 GWh33%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_ASLVW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Assel Valley

Assel Valley is an onshore wind farm in Strathclyde, Scotland, with 26 MW of registered generating capacity across one balancing mechanism unit. It is the 146th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Nadara. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Assel Valley as operational since October 2016, with 11 turbines of 2.3 MW.

Assel Valley
Where Assel Valley is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity26 MW
Turbines11 turbines of 2.3 MW
Operational sinceOctober 2016
LocationStrathclyde, Scotland
Grid regionSouth Scotland
Owner groupNadara (operator or majority owner; joint ventures simplified)
Operator in REPDFalck Renewables
Elexon lead partyNpower Commercial Gas Limited
BM unit E_ASLVW-1 26 MW
Size146th largest of 163

Download and cite

Assel Valley daily output (CSV)

Every finished UK day GridMonkey has recorded for Assel Valley, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Assel Valley Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/assel-valley/ (Accessed: [date]).

Other Nadara wind farms

More wind farms in South Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.