Glenchamber wind farm

Glenchamber is an onshore wind farm in Dumfries and Galloway, Scotland with 27 MW of registered capacity. In 2025 it generated 66.6 GWh, a load factor of 28%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Glenchamber since 2019: every month and year

Elexon's metered record for Glenchamber's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 529 GWh. Its busiest whole year was 2022, at a load factor of 32%. Its best day was 21 December 2023, when it generated 646 MWh, 27 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 27 MW. Hover over or tap a bar for the month’s figures.
Glenchamber's metered output by year
YearGeneratedLoad factor
2026to 24 Oct59.7 GWh31%
202566.6 GWh28%
202467.9 GWh29%
202367.2 GWh28%
202276.8 GWh32%
202158.8 GWh25%
202070.2 GWh30%
2019from 1 Feb61.7 GWh29%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_GLCHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Glenchamber

Glenchamber is an onshore wind farm in Dumfries and Galloway, Scotland, with 27 MW of registered generating capacity across one balancing mechanism unit. It is the 144th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Fern Trading. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Glenchamber as operational since June 2016, with 11 turbines of 2.5 MW.

Glenchamber
Where Glenchamber is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity27 MW
Turbines11 turbines of 2.5 MW
Operational sinceJune 2016
LocationDumfries and Galloway, Scotland
Grid regionSouth Scotland
Owner groupFern Trading (operator or majority owner; joint ventures simplified)
Operator in REPDRenewable Energy Systems (RES)
Elexon lead partyENGIE Power Limited
BM unit E_GLCHW-1 27 MW
Size144th largest of 163

Download and cite

Glenchamber daily output (CSV)

Every finished UK day GridMonkey has recorded for Glenchamber, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Glenchamber Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/glenchamber/ (Accessed: [date]).

Other Fern Trading wind farms

More wind farms in South Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.