Harburnhead wind farm

Harburnhead is an onshore wind farm in Lothian, Scotland with 52 MW of registered capacity. In 2025 it generated 119 GWh, a load factor of 26%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Harburnhead since 2019: every month and year

Elexon's metered record for Harburnhead's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 900 GWh. Its busiest whole year was 2020, at a load factor of 32%. Its best day was 29 December 2019, when it generated 1,191 MWh, 50 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 52 MW. Hover over or tap a bar for the month’s figures.
Harburnhead's metered output by year
YearGeneratedLoad factor
2026to 24 Oct52.7 GWh14%
2025119 GWh26%
2024123 GWh27%
2023118 GWh26%
2022133 GWh29%
202196.1 GWh21%
2020146 GWh32%
2019from 1 Feb112 GWh27%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_HBHDW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Harburnhead

Harburnhead is an onshore wind farm in Lothian, Scotland, with 52 MW of registered generating capacity across one balancing mechanism unit. It is the 96th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Gresham House. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Harburnhead as operational since December 2016, with 22 turbines of 2.35 MW, up to 126 m tall to the blade tip.

Harburnhead
Where Harburnhead is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity52 MW
Turbines22 turbines of 2.35 MW
Height to blade tip126 m
Operational sinceDecember 2016
LocationLothian, Scotland
Grid regionSouth Scotland
Owner groupGresham House (operator or majority owner; joint ventures simplified)
Operator in REPDGresham House
Elexon lead partyLDV Harburnhead Ltd
BM unit E_HBHDW-1 52 MW
Size96th largest of 163

Download and cite

Harburnhead daily output (CSV)

Every finished UK day GridMonkey has recorded for Harburnhead, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Harburnhead Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/harburnhead/ (Accessed: [date]).

More wind farms in South Scotland

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.