Farr wind farm

What Farr is generating right now, and over the last week: live from Elexon, the GB electricity market's data service.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Farr

Farr is an onshore wind farm in Highland, Scotland, with 92 MW of generating capacity across 2 balancing mechanism units: Elexon registers them at 184 MW in all, but Nadara gives it 92 MW, and that is the capacity this page uses. It is the 59th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Nadara. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Farr as operational since October 2005, with 40 turbines of 2.3 MW.

Farr
Where Farr is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Capacity92 MW (Nadara)
Registered capacity184 MW (Elexon)
Turbines40 turbines of 2.3 MW
Operational sinceOctober 2005
LocationHighland, Scotland
Owner groupNadara (operator or majority owner; joint ventures simplified)
Operator in REPDInnogy
Elexon lead partySmartestenergy Limited
BM units T_FARR-1 92 MW, T_FARR-2 92 MW
Size59th largest of 163

Download and cite

Farr daily output (CSV)

Every finished UK day GridMonkey has recorded for Farr, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Farr Wind Farm: Live Output and Last 7 Days. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/farr/ (Accessed: [date]).

Other Nadara wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.