Elexon's metered record for Farr's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.4 TWh. Its busiest whole year was 2022, at a load factor of 28%. Its best day was 8 February 2022, when it generated 2,045 MWh, 85 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 177 GWh | 27% |
| 2025 | 185 GWh | 23% |
| 2024 | 170 GWh | 21% |
| 2023 | 161 GWh | 20% |
| 2022 | 228 GWh | 28% |
| 2021 | 162 GWh | 20% |
| 2020 | 156 GWh | 19% |
| 2019from 1 Feb | 173 GWh | 24% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_FARR-1, T_FARR-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Farr
Farr is an onshore wind farm in Highland, Scotland, with 92 MW of generating capacity across 2 balancing mechanism units: Elexon registers them at 184 MW in all, but Nadara gives it 92 MW, and that is the capacity this page uses. It is the 60th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Nadara. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Farr as operational since October 2005, with 40 turbines of 2.3 MW.
| Type | Onshore wind farm |
|---|---|
| Capacity | 92 MW (Nadara) |
| Registered capacity | 184 MW (Elexon) |
| Turbines | 40 turbines of 2.3 MW |
| Operational since | October 2005 |
| Location | Highland, Scotland |
| Owner group | Nadara (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Innogy |
| Elexon lead party | Smartestenergy Limited |
| BM units | T_FARR-1 92 MW, T_FARR-2 92 MW |
| Size | 60th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Farr, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Farr Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/farr/ (Accessed: [date]).
Other Nadara wind farms
- Kilbraur onshore, 69 MW
- Millennium onshore, 65 MW
- Galawhistle onshore, 55 MW
- Causeymire onshore, 48 MW
- A'Chruach onshore, 43 MW
- Minsca onshore, 38 MW
- Auchrobert onshore, 36 MW
- Dalswinton onshore, 30 MW
- Assel Valley onshore, 26 MW
- Gordonstown onshore, 13 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.