Loading the live figure from Elexon…
Output over the last 7 days
Greengairs East since 2023: every month and year
Elexon's metered record for Greengairs East's unit starts on 17 April 2023, and runs to 24 October 2026. In that time it has generated 266 GWh. Its busiest whole year was 2024, at a load factor of 23%. Its best day was 11 March 2026, when it generated 827 MWh, 34 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 69.9 GWh | 26% |
| 2025 | 73.4 GWh | 22% |
| 2024 | 76.7 GWh | 23% |
| 2023from 17 Apr | 45.8 GWh | 18% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_GRGRW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Greengairs East
Greengairs East is an onshore wind farm in Strathclyde, Scotland, with 38 MW of registered generating capacity across one balancing mechanism unit. It is the 122nd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Muirhall Energy. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Greengairs East as operational since August 2023, with 8 turbines of 3 MW, up to 125 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 38 MW |
| Turbines | 8 turbines of 3 MW |
| Height to blade tip | 125 m |
| Operational since | August 2023 |
| Location | Strathclyde, Scotland |
| Grid region | South Scotland |
| Owner group | Muirhall Energy (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Muirhall Energy |
| Elexon lead party | Evolve Energy Supply Limited |
| BM unit | E_GRGRW-1 38 MW |
| Size | 122nd largest of 163 |
Download and cite
Greengairs East daily output (CSV)
Every finished UK day GridMonkey has recorded for Greengairs East, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Greengairs East Wind Farm: Live Output and History Since 2023. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/greengairs-east/ (Accessed: [date]).
Other Muirhall Energy wind farms
- Priestgill onshore, 44 MW
More wind farms in South Scotland
- Harburnhead onshore, 52 MW
- Airies onshore, 38 MW
- Minsca onshore, 38 MW
- Auchrobert onshore, 36 MW
- Pines Burn onshore, 36 MW
- Andershaw onshore, 35 MW
- Dalswinton onshore, 30 MW
- Hare Hill Extension onshore, 30 MW
- Solwaybank onshore, 30 MW
- Glenchamber onshore, 27 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since April 2023 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.