Output over the last 7 days
Viking since 2024: every month and year
Elexon's metered record for Viking's units starts on 25 May 2024, and runs to 24 October 2026. In that time it has generated 1.5 TWh. Its best day was 7 December 2025, when it generated 9,154 MWh, 381 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 539 GWh | 15% |
| 2025 | 599 GWh | 14% |
| 2024from 25 May | 358 GWh | 12% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 4 units (T_VKNGW-1, T_VKNGW-2, T_VKNGW-3, T_VKNGW-4), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Viking
Viking is an onshore wind farm in Shetland, Scotland, with 488 MW of registered generating capacity across 4 balancing mechanism units. It is the 20th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Viking as operational since September 2024, with 103 turbines, up to 155 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 488 MW |
| Turbines | 103 turbines |
| Height to blade tip | 155 m |
| Operational since | September 2024 |
| Location | Shetland, Scotland |
| Owner group | SSE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Viking Energy Wind Farm |
| Elexon lead party | Viking Energy Wind Farm LLP |
| BM units | T_VKNGW-1 122 MW, T_VKNGW-2 122 MW, T_VKNGW-3 122 MW, T_VKNGW-4 122 MW |
| Size | 20th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Viking, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Viking Wind Farm: Live Output and History Since 2024. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/viking/ (Accessed: [date]).
Other SSE wind farms
- Dogger Bank A offshore, 1,200 MW
- Dogger Bank B offshore, 1,199 MW
- Seagreen offshore, 1,075 MW
- Beatrice offshore, 588 MW
- Clyde onshore, 550 MW
- Greater Gabbard offshore, 539 MW
- Stronelairg onshore, 228 MW
- Griffin onshore, 206 MW
- Hadyard Hill onshore, 117 MW
- Bhlaraidh onshore, 108 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2024 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.