Output over the last 7 days
Hadyard Hill since 2019: every month and year
Elexon's metered record for Hadyard Hill's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.4 TWh. Its busiest whole year was 2024, at a load factor of 22%. Its best day was 3 February 2021, when it generated 2,292 MWh, 96 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 4 MWh | 0% |
| 2025 | 193 GWh | 19% |
| 2024 | 231 GWh | 22% |
| 2023 | 199 GWh | 19% |
| 2022 | 217 GWh | 21% |
| 2021 | 185 GWh | 18% |
| 2020 | 199 GWh | 19% |
| 2019from 1 Feb | 165 GWh | 18% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_HADHW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Hadyard Hill
Hadyard Hill is an onshore wind farm in Strathclyde, Scotland, with 117 MW of generating capacity across one balancing mechanism unit: Elexon registers it at 130 MW, but SSE gives it 117 MW, and that is the capacity this page uses. It is the 52nd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
Hadyard Hill has sent no power since 19 December 2025, when it was taken offline after a technical fault was found; its latest notice to the market (October 2026) expects its turbines back in service between November 2026 and March 2027. The league table lists it without a rank while it sends no power.
The government's Renewable Energy Planning Database lists Hadyard Hill as operational since May 2006, with 52 turbines of 2.3 MW.
| Type | Onshore wind farm |
|---|---|
| Capacity | 117 MW (SSE) |
| Registered capacity | 130 MW (Elexon) |
| Turbines | 52 turbines of 2.3 MW |
| Status now | Sending no power since 19 December 2025 (Elexon REMIT) |
| Operational since | May 2006 |
| Location | Strathclyde, Scotland |
| Owner group | SSE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Scottish and Southern Energy |
| Elexon lead party | SSE Renewables Wind Farms |
| BM unit | T_HADHW-1 130 MW |
| Size | 52nd largest of 163 |
Download and cite
Hadyard Hill daily output (CSV)
Every finished UK day GridMonkey has recorded for Hadyard Hill, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Hadyard Hill Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/hadyard-hill/ (Accessed: [date]).
Other SSE wind farms
- Dogger Bank A offshore, 1,200 MW
- Dogger Bank B offshore, 1,199 MW
- Seagreen offshore, 1,075 MW
- Beatrice offshore, 588 MW
- Clyde onshore, 550 MW
- Greater Gabbard offshore, 539 MW
- Viking onshore, 488 MW
- Stronelairg onshore, 228 MW
- Griffin onshore, 206 MW
- Bhlaraidh onshore, 108 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.