Dogger Bank A wind farm

What Dogger Bank A is generating right now, and over the last week: live from Elexon, the GB electricity market's data service.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Dogger Bank A

Dogger Bank A is an offshore wind farm off the coast of England, with 1,200 MW of registered generating capacity across 5 balancing mechanism units. It is the 3rd largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

Dogger Bank A is still being commissioned: it first sent power to the grid in October 2023 and all 95 of its turbines were in place by February 2026, but SSE, which is building it, said in July 2026 that commissioning work continues. The league table lists it without a rank until it is running in full.

The government's Renewable Energy Planning Database lists Dogger Bank A & B together as under construction in the July 2026 edition, with turbines up to 260 m tall to the blade tip. Dogger Bank Wind Farm gives Dogger Bank A alone 95 turbines of 13 MW.

Dogger Bank A
Where Dogger Bank A is, from its REPD location. Map outline: Natural Earth.
TypeOffshore wind farm
Registered capacity1,200 MW
Turbines95 turbines of 13 MW (Dogger Bank Wind Farm)
Height to blade tip260 m
Status nowNot yet running in full (SSE)
StatusUnder construction (REPD, July 2026)
LocationOff the coast of England
Owner groupSSE (operator or majority owner; joint ventures simplified)
Operator in REPDSSE / Equinor
Elexon lead partyDoggerbank OWF Project 1
BM units T_DBAWO-1 302 MW, T_DBAWO-2 304 MW, T_DBAWO-3 303 MW, T_DBAWO-4 153 MW, T_DBAWO-5 138 MW
Size3rd largest of 163

Other SSE wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.