Output over the last 7 days
Greater Gabbard since 2019: every month and year
Elexon's metered record for Greater Gabbard's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 13.0 TWh. Its busiest whole year was 2020, at a load factor of 41%. Its best day was 15 December 2019, when it generated 11,493 MWh, 479 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 1.3 TWh | 34% |
| 2025 | 1.6 TWh | 34% |
| 2024 | 1.6 TWh | 34% |
| 2023 | 1.7 TWh | 37% |
| 2022 | 1.6 TWh | 34% |
| 2021 | 1.7 TWh | 35% |
| 2020 | 1.9 TWh | 41% |
| 2019from 1 Feb | 1.5 TWh | 36% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 3 units (T_GRGBW-1, T_GRGBW-2, T_GRGBW-3), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Greater Gabbard
Greater Gabbard is an offshore wind farm off the coast of England, with 539 MW of registered generating capacity across 3 balancing mechanism units. It is the 19th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Greater Gabbard as operational since September 2012, with 140 turbines of 3.6 MW.
| Type | Offshore wind farm |
|---|---|
| Registered capacity | 539 MW |
| Turbines | 140 turbines of 3.6 MW |
| Operational since | September 2012 |
| Location | Off the coast of England |
| Owner group | SSE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Airtricity / Fluor |
| Elexon lead party | Greater Gabbard Offshore Winds |
| BM units | T_GRGBW-1 205 MW, T_GRGBW-2 167 MW, T_GRGBW-3 167 MW |
| Size | 19th largest of 163 |
Download and cite
Greater Gabbard daily output (CSV)
Every finished UK day GridMonkey has recorded for Greater Gabbard, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Greater Gabbard Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/greater-gabbard/ (Accessed: [date]).
Other SSE wind farms
- Dogger Bank A offshore, 1,200 MW
- Dogger Bank B offshore, 1,199 MW
- Seagreen offshore, 1,075 MW
- Beatrice offshore, 588 MW
- Clyde onshore, 550 MW
- Viking onshore, 488 MW
- Stronelairg onshore, 228 MW
- Griffin onshore, 206 MW
- Hadyard Hill onshore, 117 MW
- Bhlaraidh onshore, 108 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.