Stronelairg since 2019: every month and year
Elexon's metered record for Stronelairg's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 4.6 TWh. Its busiest whole year was 2022, at a load factor of 39%. Its best day was 22 January 2026, when it generated 5,258 MWh, 219 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 512 GWh | 32% |
| 2025 | 615 GWh | 31% |
| 2024 | 563 GWh | 28% |
| 2023 | 543 GWh | 27% |
| 2022 | 782 GWh | 39% |
| 2021 | 633 GWh | 32% |
| 2020 | 442 GWh | 22% |
| 2019from 1 Feb | 546 GWh | 30% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 3 units (T_STLGW-1, T_STLGW-2, T_STLGW-3), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Stronelairg
Stronelairg is an onshore wind farm in Highland, Scotland, with 228 MW of generating capacity across 3 balancing mechanism units: Elexon registers them at 324 MW in all, but SSE gives it 228 MW, and that is the capacity this page uses. It is the 37th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Stronelairg as operational since December 2018, with 66 turbines of 3.45 MW, up to 135 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Capacity | 228 MW (SSE) |
| Registered capacity | 324 MW (Elexon) |
| Turbines | 66 turbines of 3.45 MW |
| Height to blade tip | 135 m |
| Operational since | December 2018 |
| Location | Highland, Scotland |
| Owner group | SSE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Scottish and Southern Energy |
| Elexon lead party | Stronelairg Windfarm Limited |
| BM units | T_STLGW-1 108 MW, T_STLGW-2 108 MW, T_STLGW-3 108 MW |
| Size | 37th largest of 163 |
Download and cite
Stronelairg daily output (CSV)
Every finished UK day GridMonkey has recorded for Stronelairg, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Stronelairg Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/stronelairg/ (Accessed: [date]).
Other SSE wind farms
- Dogger Bank A offshore, 1,200 MW
- Dogger Bank B offshore, 1,199 MW
- Seagreen offshore, 1,075 MW
- Beatrice offshore, 588 MW
- Clyde onshore, 550 MW
- Greater Gabbard offshore, 539 MW
- Viking onshore, 488 MW
- Griffin onshore, 206 MW
- Hadyard Hill onshore, 117 MW
- Bhlaraidh onshore, 108 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.