Beatrice wind farm

Beatrice is an offshore wind farm off the coast of Scotland with 588 MW of capacity. In 2025 it generated 2.0 TWh, a load factor of 39%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Beatrice since 2019: every month and year

Elexon's metered record for Beatrice's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 16.0 TWh. Its busiest whole year was 2020, at a load factor of 47%. Its best day was 21 January 2021, when it generated 13,688 MWh, 570 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 588 MW. Hover over or tap a bar for the month’s figures.
Beatrice's metered output by year
YearGeneratedLoad factor
2026to 24 Oct1.7 TWh41%
20252.0 TWh39%
20242.3 TWh44%
20231.9 TWh38%
20221.9 TWh37%
20211.8 TWh35%
20202.4 TWh47%
2019from 1 Feb2.0 TWh43%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 4 units (T_BEATO-1, T_BEATO-2, T_BEATO-3, T_BEATO-4), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Beatrice

Beatrice is an offshore wind farm off the coast of Scotland, with 588 MW of generating capacity across 4 balancing mechanism units: Elexon registers them at 682 MW in all, but SSE gives it 588 MW, and that is the capacity this page uses. It is the 16th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Beatrice as operational since August 2019, with 84 turbines of 7 MW.

Beatrice
Where Beatrice is, from its REPD location. Map outline: Natural Earth.
TypeOffshore wind farm
Capacity588 MW (SSE)
Registered capacity682 MW (Elexon)
Turbines84 turbines of 7 MW
Operational sinceAugust 2019
LocationOff the coast of Scotland
Owner groupSSE (operator or majority owner; joint ventures simplified)
Operator in REPDScottish & Southern Energy
Elexon lead partyBeatrice Offshore Windfarm Ltd
BM units T_BEATO-1 184 MW, T_BEATO-2 166 MW, T_BEATO-3 166 MW, T_BEATO-4 166 MW
Size16th largest of 163

Download and cite

Beatrice daily output (CSV)

Every finished UK day GridMonkey has recorded for Beatrice, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Beatrice Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/beatrice/ (Accessed: [date]).

Other SSE wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.