Loading the live figure from Elexon…
Output over the last 7 days
Bhlaraidh since 2019: every month and year
Elexon's metered record for Bhlaraidh's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.6 TWh. Its busiest whole year was 2022, at a load factor of 26%. Its best day was 3 February 2021, when it generated 2,482 MWh, 103 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 189 GWh | 25% |
| 2025 | 190 GWh | 20% |
| 2024 | 192 GWh | 20% |
| 2023 | 158 GWh | 17% |
| 2022 | 245 GWh | 26% |
| 2021 | 194 GWh | 21% |
| 2020 | 184 GWh | 19% |
| 2019from 1 Feb | 201 GWh | 23% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BHLAW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Bhlaraidh
Bhlaraidh is an onshore wind farm in Highland, Scotland, with 108 MW of registered generating capacity across one balancing mechanism unit. It is the 55th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Bhlaraidh as operational since September 2017, with 32 turbines of 3.43 MW, up to 135 m tall to the blade tip.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 108 MW |
| Turbines | 32 turbines of 3.43 MW |
| Height to blade tip | 135 m |
| Operational since | September 2017 |
| Location | Highland, Scotland |
| Owner group | SSE (operator or majority owner; joint ventures simplified) |
| Operator in REPD | Scottish and Southern Energy |
| Elexon lead party | SSE Generation Ltd |
| BM unit | T_BHLAW-1 108 MW |
| Size | 55th largest of 163 |
Download and cite
Every finished UK day GridMonkey has recorded for Bhlaraidh, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Bhlaraidh Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/bhlaraidh/ (Accessed: [date]).
Other SSE wind farms
- Dogger Bank A offshore, 1,200 MW
- Dogger Bank B offshore, 1,199 MW
- Seagreen offshore, 1,075 MW
- Beatrice offshore, 588 MW
- Clyde onshore, 550 MW
- Greater Gabbard offshore, 539 MW
- Viking onshore, 488 MW
- Stronelairg onshore, 228 MW
- Griffin onshore, 206 MW
- Hadyard Hill onshore, 117 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.