Gordonbush wind farm

Gordonbush is an onshore wind farm in Highland, Scotland with 72 MW of capacity. In 2025 it generated 157 GWh, a load factor of 25%. What it is generating right now and over the last week, live from Elexon, the GB electricity market's data service, and every month since February 2019.

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Gordonbush since 2019: every month and year

Elexon's metered record for Gordonbush's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 1.3 TWh. Its busiest whole year was 2024, at a load factor of 30%. Its best day was 3 February 2021, when it generated 1,668 MWh, 70 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 72 MW. Hover over or tap a bar for the month’s figures.
Gordonbush's metered output by year
YearGeneratedLoad factor
2026to 24 Oct141 GWh27%
2025157 GWh25%
2024191 GWh30%
2023163 GWh26%
2022190 GWh30%
2021164 GWh26%
2020137 GWh22%
2019from 1 Feb167 GWh29%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_GORDW-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Gordonbush

Gordonbush is an onshore wind farm in Highland, Scotland, with 72 MW of generating capacity across one balancing mechanism unit: Elexon registers it at 87 MW, but SSE gives it 72 MW, and that is the capacity this page uses. It is the 70th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Gordonbush as operational since June 2012, with 35 turbines of 2 MW.

Gordonbush
Where Gordonbush is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Capacity72 MW (SSE)
Registered capacity87 MW (Elexon)
Turbines35 turbines of 2 MW
Operational sinceJune 2012
LocationHighland, Scotland
Owner groupSSE (operator or majority owner; joint ventures simplified)
Operator in REPDScottish and Southern Energy
Elexon lead partySSE Generation Ltd
BM unit T_GORDW-1 87 MW
Size70th largest of 163

Download and cite

Gordonbush daily output (CSV)

Every finished UK day GridMonkey has recorded for Gordonbush, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Gordonbush Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/gordonbush/ (Accessed: [date]).

Other SSE wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.