About Dunmaglass

Dunmaglass is an onshore wind farm in Highland, Scotland, with 100 MW of registered generating capacity across one balancing mechanism unit. It is the 56th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by SSE. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Dunmaglass as operational since September 2016, with 33 turbines of 3 MW.

Dunmaglass
Where Dunmaglass is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity100 MW
Turbines33 turbines of 3 MW
Operational sinceSeptember 2016
LocationHighland, Scotland
Owner groupSSE (operator or majority owner; joint ventures simplified)
Operator in REPDScottish and Southern Energy
Elexon lead partyDunmaglass Wind Farm Limited
BM unit T_DUNGW-1 100 MW
Size56th largest of 163

Other SSE wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.