Tye Lane Solar Farm since 2025: every month and year
Elexon's metered record for Tye Lane Solar Farm's unit starts on 14 October 2025, and runs to 24 October 2026. In that time it has generated 59.4 GWh. Its best day was 24 May 2026, when it generated 467 MWh, 19 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 59.4 GWh | 17% |
| 2025from 14 Oct | 1 MWh | 0% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_TYLNS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Tye Lane Solar Farm
Tye Lane Solar Farm is a 50 MW solar farm at Bramford, near Ipswich, in Suffolk. It has been sending power to the grid since February 2026, by Elexon's metered figures, though the planning database (July 2026) still lists it as under construction. It shares its grid connection with a battery about 2 km away, beside Bramford substation (Tye Lane battery storage, live on its own page).
Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Tye Lane Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?
| Type | Solar farm |
|---|---|
| Registered capacity | 50 MW (Elexon) |
| Installed capacity | 49.9 MW (REPD) |
| Status | Generating since February 2026 (Elexon); under construction in REPD (July 2026) |
| Construction began | January 2025 (REPD) |
| Site area | 85 hectares (REPD) |
| Battery on its connection | About 2 km away, beside Bramford substation (Power Systems UK) Tye Lane battery storage, live → |
| Area | Suffolk |
| Location | At Bramford, near Ipswich, in Suffolk 52.084° N, 1.077° E |
| Planning authority | Mid Suffolk |
| Owner | EDF |
| Operator in REPD | EDF Energy Renewables |
| Elexon lead party | DAMSONGREEN ENERGYFARM LIMITED |
| BM unit | T_TYLNS-1 50 MW |
| Size | Joint 2nd largest of the eight solar farms that report live, by registered capacity |
Download and cite
Tye Lane Solar Farm daily output (CSV)
Every finished UK day GridMonkey has recorded for Tye Lane Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Tye Lane Solar Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/tye-lane-solar-farm/ (Accessed: [date]).
The other solar farms that report live
- Cleve Hill Solar Park 317 MW, Kent
- Breach Solar Farm 50 MW, Cambridgeshire
- Bulphan Fen Solar Farm 50 MW, Essex
- Burwell Solar Farm 50 MW, Cambridgeshire
- Larks Green Solar Farm 50 MW, South Gloucestershire
- Sutton Bridge Solar Farm 49 MW, Lincolnshire
- Tebworth Solar Farm 46 MW, Bedfordshire
All eight solar farms, live on a map → Every wind farm, live on a map → Power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2025 is its metered output (B1610). Installed capacity, status, dates, site area, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0. The battery on its grid connection: Power Systems UK, which built the connection.