Tebworth Solar Farm

Tebworth Solar Farm is a 46 MW solar farm near Tebworth, by Leighton Buzzard, in Bedfordshire. In 2026 so far (to 24 Oct) it generated 56.3 GWh, a load factor of 17%. Is it generating right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since May 2025.

Checking Elexon for Tebworth Solar Farm's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Tebworth Solar Farm since 2025: every month and year

Elexon's metered record for Tebworth Solar Farm's unit starts on 12 May 2025, and runs to 24 October 2026. In that time it has generated 62.6 GWh. Its best day was 25 June 2026, when it generated 396 MWh, 17 MW on average.

Its average output each month, in MW. Its capacity today is 46 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Tebworth Solar Farm's metered output by year
YearGeneratedLoad factor
2026to 24 Oct56.3 GWh17%
2025from 12 May6.3 GWh2%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_TEBWS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Tebworth Solar Farm

Tebworth Solar Farm is a 46 MW solar farm near Tebworth, by Leighton Buzzard, in Bedfordshire. It has been sending power to the grid since June 2025, by Elexon's metered figures, though the planning database (July 2026) still lists it as under construction. It shares its site with a battery, which the planning database lists as under construction (Tebworth battery storage, live on its own page).

Its 46 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Tebworth Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?

Tebworth
Where Tebworth Solar Farm is. From its REPD location. Map outline: Natural Earth.
TypeSolar farm
Registered capacity46 MW (Elexon)
StatusGenerating since June 2025 (Elexon); under construction in REPD (July 2026)
Construction beganJanuary 2024 (REPD)
Site area69 hectares (REPD)
Battery on the site under construction (REPD)
Tebworth battery storage, live →
AreaBedfordshire
LocationNear Tebworth, by Leighton Buzzard, in Bedfordshire
51.922° N, 0.578° W
Planning authorityCentral Bedfordshire
OwnerCVC DIF
Operator in REPDSundon Green Limited
Elexon lead partySundon Green Limited
BM unit T_TEBWS-1 46 MW
Size The smallest of the eight solar farms that report live, by registered capacity

Download and cite

Tebworth Solar Farm daily output (CSV)

Every finished UK day GridMonkey has recorded for Tebworth Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Tebworth Solar Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/tebworth-solar-farm/ (Accessed: [date]).

The other solar farms that report live

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2025 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

See all of Britain's solar, live

GridMonkey's pie shows Britain's whole electricity mix every half hour, rooftop and field solar included, and the cleanest time to use power today. Free, no sign-up.