Cleve Hill Solar Park is a 317 MW solar farm near Graveney, between Faversham and Whitstable, in Kent. The government's planning database gives it 373 MW installed, more than any other solar farm operating in Great Britain. Is it generating right now? Its live output from Elexon, the GB electricity market's data service, and every half hour of the last week.

Checking Elexon for Cleve Hill Solar Park's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Cleve Hill Solar Park

Cleve Hill Solar Park is a 317 MW solar farm near Graveney, between Faversham and Whitstable, in Kent. It has been operational since July 2025, according to the planning database. It shares its site with a 150 MW battery, which Quinbrook, its owner, lists as still under construction, due in 2026 (the planning database lists it as operational since July 2025).

Its 317 MW of registered generating capacity is spread across two balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart. The live percentage uses this registered figure, not the 373 MW installed that the planning database gives.

Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Cleve Hill Solar Park is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?

Cleve Hill
Where Cleve Hill Solar Park is. From its REPD location. Map outline: Natural Earth.
TypeSolar farm
Registered capacity317 MW (Elexon)
Installed capacity373 MW (REPD)
StatusOperational since July 2025 (REPD, July 2026)
Construction beganApril 2023 (REPD)
Site area364 hectares (REPD)
Battery on the site 150 MW, still under construction, due in 2026 (Quinbrook); operational since July 2025 in REPD
AreaKent
LocationNear Graveney, between Faversham and Whitstable, in Kent
51.339° N, 0.914° E
Planning authorityThe Planning Inspectorate (nationally significant infrastructure)
OwnerQuinbrook
Operator in REPDQuinbrook Infrastructure Partners
Elexon lead partyCleve Hill Solar Park
BM units T_CLVHS-1 112 MW, T_CLVHS-2 205 MW
Size The largest of the 1,386 solar farms operating in Great Britain (REPD)

The other solar farms that report live

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its output here is its physical notification, not metered generation. Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

See all of Britain's solar, live

GridMonkey's pie shows Britain's whole electricity mix every half hour, rooftop and field solar included, and the cleanest time to use power today. Free, no sign-up.