Checking Elexon for Cleve Hill Solar Park's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Cleve Hill Solar Park since 2025: every month and year
Elexon's metered record for Cleve Hill Solar Park's units starts on 14 March 2025, and runs to 24 October 2026. In that time it has generated 572 GWh. Its best day was 12 July 2025, when it generated 2,517 MWh, 105 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 330 GWh | 15% |
| 2025from 14 Mar | 242 GWh | 10% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (T_CLVHS-1, T_CLVHS-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Cleve Hill Solar Park
Cleve Hill Solar Park is a 317 MW solar farm near Graveney, between Faversham and Whitstable, in Kent. It has been operational since July 2025, according to the planning database. It shares its site with a 150 MW battery, which Quinbrook, its owner, lists as still under construction, due in 2026 (the planning database lists it as operational since July 2025).
Its 317 MW of registered generating capacity is spread across two balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart. The live percentage uses this registered figure, not the 373 MW installed that the planning database gives.
Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Cleve Hill Solar Park is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?
| Type | Solar farm |
|---|---|
| Registered capacity | 317 MW (Elexon) |
| Installed capacity | 373 MW (REPD) |
| Status | Operational since July 2025 (REPD, July 2026) |
| Construction began | April 2023 (REPD) |
| Site area | 364 hectares (REPD) |
| Battery on the site | 150 MW, still under construction, due in 2026 (Quinbrook); operational since July 2025 in REPD |
| Area | Kent |
| Location | Near Graveney, between Faversham and Whitstable, in Kent 51.339° N, 0.914° E |
| Planning authority | The Planning Inspectorate (nationally significant infrastructure) |
| Owner | Quinbrook |
| Operator in REPD | Quinbrook Infrastructure Partners |
| Elexon lead party | Cleve Hill Solar Park |
| BM units | T_CLVHS-1 112 MW, T_CLVHS-2 205 MW |
| Size | The largest of the 1,386 solar farms operating in Great Britain (REPD) |
Download and cite
Cleve Hill Solar Park daily output (CSV)
Every finished UK day GridMonkey has recorded for Cleve Hill Solar Park, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Cleve Hill Solar Park: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/cleve-hill-solar-park/ (Accessed: [date]).
The other solar farms that report live
- Breach Solar Farm 50 MW, Cambridgeshire
- Bulphan Fen Solar Farm 50 MW, Essex
- Burwell Solar Farm 50 MW, Cambridgeshire
- Larks Green Solar Farm 50 MW, South Gloucestershire
- Tye Lane Solar Farm 50 MW, Suffolk
- Sutton Bridge Solar Farm 49 MW, Lincolnshire
- Tebworth Solar Farm 46 MW, Bedfordshire
All eight solar farms, live on a map → Every wind farm, live on a map → Power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since March 2025 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.