Sutton Bridge Solar Farm

Sutton Bridge Solar Farm is a 49 MW solar farm at Sutton Bridge, near Spalding, in Lincolnshire. The government's planning database gives it 49.9 MW installed: joint ninth largest of the 1,386 solar farms operating in Great Britain. In 2025 it generated 66.8 GWh, a load factor of 16%. Is it generating right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since September 2023.

Checking Elexon for Sutton Bridge Solar Farm's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Sutton Bridge Solar Farm since 2023: every month and year

Elexon's metered record for Sutton Bridge Solar Farm's unit starts on 21 September 2023, and runs to 24 October 2026. In that time it has generated 165 GWh. Its busiest whole year was 2025, at a load factor of 16%. Its best day was 25 June 2024, when it generated 479 MWh, 20 MW on average.

Its average output each month, in MW. Its capacity today is 49 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Sutton Bridge Solar Farm's metered output by year
YearGeneratedLoad factor
2026to 24 Oct43.7 GWh13%
202566.8 GWh16%
202454.6 GWh13%
2023from 21 Sep116 MWh0.1%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_SUTBS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Sutton Bridge Solar Farm

Sutton Bridge Solar Farm is a 49 MW solar farm at Sutton Bridge, near Spalding, in Lincolnshire. It has been operational since April 2024, according to the planning database.

Its 49 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Sutton Bridge Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?

Sutton Bridge
Where Sutton Bridge Solar Farm is. From its REPD location. Map outline: Natural Earth.
TypeSolar farm
Registered capacity49 MW (Elexon)
Installed capacity49.9 MW (REPD)
StatusOperational since April 2024 (REPD, July 2026)
Construction beganApril 2022 (REPD)
Site area118 hectares (REPD)
AreaLincolnshire
LocationAt Sutton Bridge, near Spalding, in Lincolnshire
52.757° N, 0.193° E
Planning authoritySouth Holland
OwnerEDF
Operator in REPDEDF Energy Renewables
Elexon lead partyEDF Energy Customers Limited
BM unit T_SUTBS-1 49 MW
Size Joint ninth largest of the 1,386 solar farms operating in Great Britain (REPD)

Download and cite

Sutton Bridge Solar Farm daily output (CSV)

Every finished UK day GridMonkey has recorded for Sutton Bridge Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Sutton Bridge Solar Farm: Live Output and History Since 2023. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/sutton-bridge-solar-farm/ (Accessed: [date]).

The other solar farms that report live

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since September 2023 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

See all of Britain's solar, live

GridMonkey's pie shows Britain's whole electricity mix every half hour, rooftop and field solar included, and the cleanest time to use power today. Free, no sign-up.