Checking Elexon for Bulphan Fen Solar Farm's output this half hour…
Loading the live figure from Elexon…
Output over the last 7 days
Bulphan Fen Solar Farm since 2025: every month and year
Elexon's metered record for Bulphan Fen Solar Farm's unit starts on 27 January 2025, and runs to 24 October 2026. In that time it has generated 76.3 GWh. Its best day was 3 July 2026, when it generated 588 MWh, 25 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 73.1 GWh | 21% |
| 2025from 27 Jan | 3.2 GWh | 0.7% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BLPFS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Bulphan Fen Solar Farm
Bulphan Fen Solar Farm is a 50 MW solar farm near Bulphan, by Upminster, in Essex. It has been sending power to the grid since April 2025, by Elexon's metered figures, though the planning database (July 2026) still lists it as under construction. It shares its site with a battery, which the planning database lists as under construction (Bulphan Fen battery storage, live on its own page).
Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.
Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Bulphan Fen Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?
| Type | Solar farm |
|---|---|
| Registered capacity | 50 MW (Elexon) |
| Installed capacity | 49.9 MW (REPD) |
| Status | Generating since April 2025 (Elexon); under construction in REPD (July 2026) |
| Construction began | March 2025 (REPD) |
| Site area | 168 hectares (REPD) |
| Battery on the site | under construction (REPD) Bulphan Fen battery storage, live → |
| Area | Essex |
| Location | Near Bulphan, by Upminster, in Essex 51.539° N, 0.340° E |
| Planning authority | Thurrock |
| Owner | CVC DIF |
| Operator in REPD | Warley Green Limited |
| Elexon lead party | EDF Energy Customers Limited |
| BM unit | T_BLPFS-1 50 MW |
| Size | Joint 2nd largest of the eight solar farms that report live, by registered capacity |
Download and cite
Bulphan Fen Solar Farm daily output (CSV)
Every finished UK day GridMonkey has recorded for Bulphan Fen Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Bulphan Fen Solar Farm: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/bulphan-fen-solar-farm/ (Accessed: [date]).
The other solar farms that report live
- Cleve Hill Solar Park 317 MW, Kent
- Breach Solar Farm 50 MW, Cambridgeshire
- Burwell Solar Farm 50 MW, Cambridgeshire
- Larks Green Solar Farm 50 MW, South Gloucestershire
- Tye Lane Solar Farm 50 MW, Suffolk
- Sutton Bridge Solar Farm 49 MW, Lincolnshire
- Tebworth Solar Farm 46 MW, Bedfordshire
All eight solar farms, live on a map → Every wind farm, live on a map → Power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since January 2025 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.