Larks Green Solar Farm

Larks Green Solar Farm is a 50 MW solar farm near Iron Acton in South Gloucestershire. The government's planning database gives it 70 MW installed: the fourth largest of the 1,386 solar farms operating in Great Britain. In 2025 it generated 67.8 GWh, a load factor of 15%. Is it generating right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since April 2023.

Checking Elexon for Larks Green Solar Farm's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Larks Green Solar Farm since 2023: every month and year

Elexon's metered record for Larks Green Solar Farm's unit starts on 20 April 2023, and runs to 24 October 2026. In that time it has generated 235 GWh. Its busiest whole year was 2025, at a load factor of 15%. Its best day was 16 June 2024, when it generated 475 MWh, 20 MW on average.

Its average output each month, in MW. The dashed line is its capacity today, 50 MW. Hover over or tap a bar for the month’s figures.
Larks Green Solar Farm's metered output by year
YearGeneratedLoad factor
2026to 24 Oct66.9 GWh19%
202567.8 GWh15%
202457.1 GWh13%
2023from 20 Apr42.8 GWh13%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_LARKS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Larks Green Solar Farm

Larks Green Solar Farm is a 50 MW solar farm near Iron Acton in South Gloucestershire. It has been operational since May 2023, according to the planning database. It shares its site with a 49.5 MW battery, which the planning database lists as operational since November 2024 (Larks Green battery storage, live on its own page).

Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart. The live percentage uses this registered figure, not the 70 MW installed that the planning database gives.

Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Larks Green Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?

Larks Green
Where Larks Green Solar Farm is. From its REPD location. Map outline: Natural Earth.
TypeSolar farm
Registered capacity50 MW (Elexon)
Installed capacity70 MW (REPD)
StatusOperational since May 2023 (REPD, July 2026)
Construction beganDecember 2021 (REPD)
Site area106 hectares (REPD)
Battery on the site 49.5 MW, operational since November 2024 (REPD)
Larks Green battery storage, live →
AreaSouth Gloucestershire
LocationNear Iron Acton in South Gloucestershire
51.578° N, 2.477° W
Planning authoritySouth Gloucestershire
OwnerCero Generation
Operator in REPDEnso Energy / Iron Acton Green
Elexon lead partyIron Acton Green Limited
BM unit T_LARKS-1 50 MW
Size The fourth largest of the 1,386 solar farms operating in Great Britain (REPD)

Download and cite

Larks Green Solar Farm daily output (CSV)

Every finished UK day GridMonkey has recorded for Larks Green Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Larks Green Solar Farm: Live Output and History Since 2023. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/larks-green-solar-farm/ (Accessed: [date]).

The other solar farms that report live

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since April 2023 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

See all of Britain's solar, live