Breach Solar Farm since 2024: every month and year
Elexon's metered record for Breach Solar Farm's unit starts on 14 May 2024, and runs to 24 October 2026. In that time it has generated 163 GWh. Its best day was 11 June 2025, when it generated 466 MWh, 19 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 66.2 GWh | 19% |
| 2025 | 70.4 GWh | 16% |
| 2024from 14 May | 26.2 GWh | 9% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BRCHS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Breach Solar Farm
Breach Solar Farm is a 50 MW solar farm near Burwell in Cambridgeshire. It has been operational since June 2024, according to Octopus Renewables Infrastructure Trust, which owns it (the planning database gives December 2023).
Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart. The live percentage uses this registered figure, not the 67 MW installed that the planning database gives.
Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Breach Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?
| Type | Solar farm |
|---|---|
| Registered capacity | 50 MW (Elexon) |
| Installed capacity | 67 MW (REPD) |
| Status | Operational since June 2024 (Octopus Renewables Infrastructure Trust); December 2023 in REPD |
| Site area | 73 hectares (REPD) |
| Area | Cambridgeshire |
| Location | Near Burwell in Cambridgeshire 52.292° N, 0.349° E |
| Planning authority | East Cambridgeshire |
| Owner | Octopus Renewables Infrastructure Trust |
| Operator in REPD | Octopus Renewables Infrastructure Trust |
| Elexon lead party | Burwell 11 Solar Ltd |
| BM unit | T_BRCHS-1 50 MW |
| Size | The sixth largest of the 1,386 solar farms operating in Great Britain (REPD) |
Download and cite
Breach Solar Farm daily output (CSV)
Every finished UK day GridMonkey has recorded for Breach Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Breach Solar Farm: Live Output and History Since 2024. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/breach-solar-farm/ (Accessed: [date]).
The other solar farms that report live
- Cleve Hill Solar Park 317 MW, Kent
- Bulphan Fen Solar Farm 50 MW, Essex
- Burwell Solar Farm 50 MW, Cambridgeshire
- Larks Green Solar Farm 50 MW, South Gloucestershire
- Tye Lane Solar Farm 50 MW, Suffolk
- Sutton Bridge Solar Farm 49 MW, Lincolnshire
- Tebworth Solar Farm 46 MW, Bedfordshire
All eight solar farms, live on a map → Every wind farm, live on a map → Power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2024 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.