Breach Solar Farm

Breach Solar Farm is a 50 MW solar farm near Burwell in Cambridgeshire. The government's planning database gives it 67 MW installed: the sixth largest of the 1,386 solar farms operating in Great Britain. In 2025 it generated 70.4 GWh, a load factor of 16%. Is it generating right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since May 2024.

Checking Elexon for Breach Solar Farm's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Breach Solar Farm since 2024: every month and year

Elexon's metered record for Breach Solar Farm's unit starts on 14 May 2024, and runs to 24 October 2026. In that time it has generated 163 GWh. Its best day was 11 June 2025, when it generated 466 MWh, 19 MW on average.

Its average output each month, in MW. Its capacity today is 50 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Breach Solar Farm's metered output by year
YearGeneratedLoad factor
2026to 24 Oct66.2 GWh19%
202570.4 GWh16%
2024from 14 May26.2 GWh9%

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_BRCHS-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Breach Solar Farm

Breach Solar Farm is a 50 MW solar farm near Burwell in Cambridgeshire. It has been operational since June 2024, according to Octopus Renewables Infrastructure Trust, which owns it (the planning database gives December 2023).

Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart. The live percentage uses this registered figure, not the 67 MW installed that the planning database gives.

Solar farms generate in daylight only: their output climbs from sunrise to a midday peak and falls to zero at dusk, higher on clear days and in summer. Few solar farms report their output one by one: Breach Solar Farm is one of only eight in Great Britain that do, while the government lists 1,386 as operating. Why so few?

Breach
Where Breach Solar Farm is. From its REPD location. Map outline: Natural Earth.
TypeSolar farm
Registered capacity50 MW (Elexon)
Installed capacity67 MW (REPD)
StatusOperational since June 2024 (Octopus Renewables Infrastructure Trust); December 2023 in REPD
Site area73 hectares (REPD)
AreaCambridgeshire
LocationNear Burwell in Cambridgeshire
52.292° N, 0.349° E
Planning authorityEast Cambridgeshire
OwnerOctopus Renewables Infrastructure Trust
Operator in REPDOctopus Renewables Infrastructure Trust
Elexon lead partyBurwell 11 Solar Ltd
BM unit T_BRCHS-1 50 MW
Size The sixth largest of the 1,386 solar farms operating in Great Britain (REPD)

Download and cite

Breach Solar Farm daily output (CSV)

Every finished UK day GridMonkey has recorded for Breach Solar Farm, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Breach Solar Farm: Live Output and History Since 2024. Available at: https://energycount.co.uk/tools/grid-mix/solar-farms/breach-solar-farm/ (Accessed: [date]).

The other solar farms that report live

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). The farm's name and area come from GridMonkey's own table, matched to the units in Elexon's register; its live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2024 is its metered output (B1610). Installed capacity, status, dates, site area, battery, planning authority, operator and location: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

See all of Britain's solar, live

GridMonkey's pie shows Britain's whole electricity mix every half hour, rooftop and field solar included, and the cleanest time to use power today. Free, no sign-up.