Wishaw battery storage

Wishaw is a 51 MW battery storage site in North Lanarkshire. Is it running right now? Its live output from Elexon, the GB electricity market's data service, and every half hour of the last week.

Checking Elexon for Wishaw's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

About Wishaw

Wishaw is a battery storage site in North Lanarkshire. It began operating in November 2023.

Its 51 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Wishaw
Where Wishaw is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity51 MW
Operational sinceNovember 2023 (REPD)
AreaNorth Lanarkshire
Location55.769° N, 3.938° W
Operator in REPDZenobe (REPD)
Elexon lead partyZenobe Wishaw Limited
BM unit T_WISHB-1 51 MW
Size39th largest of the 79 battery storage sites on GridMonkey's list

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and areas come from GridMonkey's own table, matched to the units in Elexon's register; a station's output here is its physical notification, not metered generation. Operator, operational date and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.