Iron Acton battery storage

Iron Acton is a 121 MW battery storage site near Iron Acton in South Gloucestershire. In 2026 so far (to 24 Oct) it supplied 101 MWh and took 451 MWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since August 2026.

Checking Elexon for Iron Acton's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Iron Acton since 2026: every month and year

Elexon's metered record for Iron Acton's unit starts on 21 August 2026, and runs to 24 October 2026. In that time it has supplied 101 MWh and taken 451 MWh while charging, giving back 22% of what it took. Its best day was 23 October 2026, when it supplied 28 MWh, 1 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 121 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Iron Acton's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct101 MWh451 MWh0%8

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_IRNAB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Iron Acton

Iron Acton is a battery storage site near Iron Acton in South Gloucestershire.

Its 121 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Iron Acton
Where Iron Acton is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity121 MW
AreaSouth Gloucestershire
LocationNear Iron Acton in South Gloucestershire
51.570° N, 2.478° W
Elexon lead partyHD000ACT Ltd
BM unit T_IRNAB-1 121 MW
Size12th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Iron Acton daily output (CSV)

Every finished UK day GridMonkey has recorded for Iron Acton, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Iron Acton Battery Storage: Live Output and History Since 2026. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/iron-acton/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since August 2026 is its metered output (B1610). Area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.