Kilmarnock South battery storage

Kilmarnock South is a 313 MW battery storage site at Kilmarnock in East Ayrshire. In 2026 so far (to 24 Oct) it supplied 166 GWh and took 189 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since November 2025.

Checking Elexon for Kilmarnock South's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Kilmarnock South since 2025: every month and year

Elexon's metered record for Kilmarnock South's units starts on 12 November 2025, and runs to 24 October 2026. In that time it has supplied 177 GWh and taken 203 GWh while charging, giving back 87% of what it took. Its best day was 14 December 2025, when it supplied 1,452 MWh, 61 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 313 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Kilmarnock South's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct166 GWh189 GWh7%296
2025from 12 Nov11.2 GWh13.9 GWh2%33

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 6 units (T_KILSB-1, T_KILSB-2, T_KILSB-3, T_KILSB-4, T_KILSB-5, T_KILSB-6), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Kilmarnock South

Kilmarnock South is a battery storage site at Kilmarnock in East Ayrshire. It began operating in January 2026.

Its 313 MW of registered generating capacity is spread across 6 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Kilmarnock South
Where Kilmarnock South is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity313 MW
Operational sinceJanuary 2026 (REPD)
AreaEast Ayrshire
LocationAt Kilmarnock in East Ayrshire
55.578° N, 4.468° W
Operator in REPDZenobē (REPD)
Elexon lead partyZENOBE KILMARNOCK SOUTH LTD
BM units T_KILSB-1 53 MW, T_KILSB-2 52 MW, T_KILSB-3 54 MW, T_KILSB-4 52 MW, T_KILSB-5 51 MW, T_KILSB-6 51 MW
Size4th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Kilmarnock South daily output (CSV)

Every finished UK day GridMonkey has recorded for Kilmarnock South, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Kilmarnock South Battery Storage: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/kilmarnock-south/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since November 2025 is its metered output (B1610). Operator, operational date, area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.