Whitelee battery storage

Whitelee battery is a 50 MW battery storage site at Whitelee wind farm, south of Glasgow, operated or mostly owned by ScottishPower. In 2025 it supplied 8.3 GWh and took 11.5 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since October 2021.

Checking Elexon for Whitelee battery's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Whitelee battery since 2021: every month and year

Elexon's metered record for Whitelee battery's unit starts on 8 October 2021, and runs to 24 October 2026. In that time it has supplied 29.3 GWh and taken 43.3 GWh while charging, giving back 68% of what it took. Its busiest whole year was 2025, at a load factor of 2%. Its best day was 28 September 2022, when it supplied 113 MWh, 5 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 50 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Whitelee battery's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct6.5 GWh8.9 GWh2%273
20258.3 GWh11.5 GWh2%350
20246.6 GWh10 GWh1%268
20235.8 GWh9.2 GWh1%192
20222.1 GWh3.5 GWh0.5%66
2021from 8 Oct4 MWh163 MWh0%2

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_WHLWB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Whitelee battery

Whitelee battery is a battery storage site at Whitelee wind farm, south of Glasgow. It began operating in October 2021.

Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Whitelee battery
Where Whitelee battery is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity50 MW
Operational sinceOctober 2021 (REPD)
AreaSouth Lanarkshire
LocationAt Whitelee wind farm, south of Glasgow
55.696° N, 4.171° W
Owner or operatorScottishPower
Elexon lead partySP Renewables (UK) Limited
BM unit T_WHLWB-1 50 MW
Size54th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Whitelee battery daily output (CSV)

Every finished UK day GridMonkey has recorded for Whitelee battery, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Whitelee Battery Storage: Live Output and History Since 2021. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/whitelee-battery/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since October 2021 is its metered output (B1610). Operational date and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.