West Burton B battery is a 49 MW battery storage site at West Burton power station in Nottinghamshire, operated or mostly owned by TotalEnergies and EPH. In 2025 it supplied 2.9 GWh and took 6.6 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for West Burton B battery's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Charging: taking power (below the line)
West Burton B battery since 2019: every month and year
Elexon's metered record for West Burton B battery's units starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 36 GWh and taken 64.4 GWh while charging, giving back 56% of what it took. Its busiest whole year was 2020, at a load factor of 2%. Its best day was 21 November 2024, when it supplied 74 MWh, 3 MW on average.
2 MW1 MW2.5 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 49 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
West Burton B battery's metered output by year
Year
Supplied
Took while charging
Load factor
Days supplying
2026to 24 Oct
3.9 GWh
7.3 GWh
1%
287
2025
2.9 GWh
6.6 GWh
0.7%
318
2024
5.5 GWh
9.2 GWh
1%
363
2023
1.3 GWh
5.2 GWh
0.3%
170
2022
5 GWh
9.1 GWh
1%
272
2021
5 GWh
8.1 GWh
1%
363
2020
6.6 GWh
10.2 GWh
2%
364
2019from 1 Feb
5.6 GWh
8.7 GWh
1%
334
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its 2 units (T_WBURB-41, T_WBURB-43), fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About West Burton B battery
West Burton B battery is a battery storage site at West Burton power station in Nottinghamshire. It began operating in June 2018.
Elexon registers its 2 balancing mechanism units at 62 MW in all, but TotalEnergies gives it 49 MW, and that is the capacity this page uses.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey records it every half hour for the chart.
Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.
Where West Burton B battery is. From its REPD location. Map outline: Natural Earth.
Type
Battery storage
Capacity
49 MW (TotalEnergies)
Registered capacity
62 MW (Elexon)
Operational since
June 2018 (REPD)
Area
Nottinghamshire
Location
At West Burton power station in Nottinghamshire 53.364° N, 0.798° W
Owner or operator
TotalEnergies and EPH
Elexon lead party
West Burton B Limited
BM units
T_WBURB-41 31 MW, T_WBURB-43 31 MW
Size
59th largest of the 79 battery storage sites on GridMonkey's list
Every finished UK day GridMonkey has recorded for West Burton B battery, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) West Burton B Battery Storage: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/west-burton-b-battery/ (Accessed: [date]).