Roosecote is a 49 MW battery storage site at Roosecote, near Barrow-in-Furness, in Cumbria. In 2025 it supplied 4.3 GWh and took 7.6 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Roosecote's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Charging: taking power (below the line)
Elexon's metered record for Roosecote's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 30.9 GWh and taken 54.9 GWh while charging, giving back 56% of what it took. Its busiest whole year was 2020, at a load factor of 2%. Its best day was 27 January 2024, when it supplied 56 MWh, 2 MW on average.
2 MW1 MW2 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 49 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Roosecote's metered output by year
Year
Supplied
Took while charging
Load factor
Days supplying
2026to 24 Oct
3.4 GWh
6.2 GWh
1%
278
2025
4.3 GWh
7.6 GWh
1%
347
2024
4.7 GWh
7.5 GWh
1%
344
2023
2.4 GWh
5.6 GWh
0.6%
218
2022
1.3 GWh
4.5 GWh
0.3%
88
2021
2 GWh
4.9 GWh
0.5%
106
2020
7.2 GWh
10.8 GWh
2%
337
2019from 1 Feb
5.5 GWh
7.8 GWh
1%
300
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its one unit, E_ROOSB-1, fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Roosecote
Roosecote is a battery storage site at Roosecote, near Barrow-in-Furness, in Cumbria. It began operating in November 2018.
Its 49 MW of registered generating capacity is spread across one balancing mechanism unit.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.
Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.
Where Roosecote is. From its REPD location. Map outline: Natural Earth.
Type
Battery storage
Registered capacity
49 MW
Operational since
November 2018 (REPD)
Area
Cumbria
Location
At Roosecote, near Barrow-in-Furness, in Cumbria 54.105° N, 3.190° W
Operator in REPD
Centrica (REPD)
Elexon lead party
CBS ENERGY STORAGE ASSETS LTD
BM unit
E_ROOSB-1 49 MW
Size
57th largest of the 79 battery storage sites on GridMonkey's list
Every finished UK day GridMonkey has recorded for Roosecote, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Roosecote Battery Storage: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/roosecote/ (Accessed: [date]).