Roosecote battery storage

Roosecote is a 49 MW battery storage site at Roosecote, near Barrow-in-Furness, in Cumbria. In 2025 it supplied 4.3 GWh and took 7.6 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.

Checking Elexon for Roosecote's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Roosecote since 2019: every month and year

Elexon's metered record for Roosecote's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 30.9 GWh and taken 54.9 GWh while charging, giving back 56% of what it took. Its busiest whole year was 2020, at a load factor of 2%. Its best day was 27 January 2024, when it supplied 56 MWh, 2 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 49 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Roosecote's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct3.4 GWh6.2 GWh1%278
20254.3 GWh7.6 GWh1%347
20244.7 GWh7.5 GWh1%344
20232.4 GWh5.6 GWh0.6%218
20221.3 GWh4.5 GWh0.3%88
20212 GWh4.9 GWh0.5%106
20207.2 GWh10.8 GWh2%337
2019from 1 Feb5.5 GWh7.8 GWh1%300

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_ROOSB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Roosecote

Roosecote is a battery storage site at Roosecote, near Barrow-in-Furness, in Cumbria. It began operating in November 2018.

Its 49 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Roosecote
Where Roosecote is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity49 MW
Operational sinceNovember 2018 (REPD)
AreaCumbria
LocationAt Roosecote, near Barrow-in-Furness, in Cumbria
54.105° N, 3.190° W
Operator in REPDCentrica (REPD)
Elexon lead partyCBS ENERGY STORAGE ASSETS LTD
BM unit E_ROOSB-1 49 MW
Size57th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Roosecote daily output (CSV)

Every finished UK day GridMonkey has recorded for Roosecote, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Roosecote Battery Storage: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/roosecote/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Operator, operational date, area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.