Roaring Hill battery storage

Roaring Hill is a 50 MW battery storage site near Glenrothes in Fife. In 2025 it supplied 37.9 GWh and took 43.2 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since March 2024.

Checking Elexon for Roaring Hill's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Roaring Hill since 2024: every month and year

Elexon's metered record for Roaring Hill's unit starts on 22 March 2024, and runs to 24 October 2026. In that time it has supplied 87.3 GWh and taken 99.4 GWh while charging, giving back 88% of what it took. Its best day was 9 August 2024, when it supplied 230 MWh, 10 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 50 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Roaring Hill's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct31.1 GWh35.2 GWh9%280
202537.9 GWh43.2 GWh9%364
2024from 22 Mar18.3 GWh21 GWh5%174

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_ROARB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Roaring Hill

Roaring Hill is a battery storage site near Glenrothes in Fife.

Its 50 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Roaring Hill
Where Roaring Hill is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity50 MW
AreaFife
LocationNear Glenrothes in Fife
56.208° N, 3.203° W
Operator in REPDTagEnergy (REPD)
Elexon lead partyTesla Motors Limited
BM unit E_ROARB-1 50 MW
Size50th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Roaring Hill daily output (CSV)

Every finished UK day GridMonkey has recorded for Roaring Hill, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Roaring Hill Battery Storage: Live Output and History Since 2024. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/roaring-hill/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since March 2024 is its metered output (B1610). Operator, area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.