Port of Tyne is a 35 MW battery storage site at the Port of Tyne in South Shields. In 2025 it supplied 4.3 GWh and took 5.7 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Port of Tyne's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Charging: taking power (below the line)
Elexon's metered record for Port of Tyne's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 44.3 GWh and taken 55.7 GWh while charging, giving back 80% of what it took. Its busiest whole year was 2023, at a load factor of 3%. Its best day was 1 September 2022, when it supplied 57 MWh, 2 MW on average.
2 MW1 MW2 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 35 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Port of Tyne's metered output by year
Year
Supplied
Took while charging
Load factor
Days supplying
2026to 24 Oct
3.7 GWh
4.9 GWh
1%
294
2025
4.3 GWh
5.7 GWh
1%
355
2024
6.9 GWh
8.5 GWh
2%
365
2023
8.2 GWh
10 GWh
3%
354
2022
6.1 GWh
7.7 GWh
2%
353
2021
4.9 GWh
6.2 GWh
2%
365
2020
5.5 GWh
6.9 GWh
2%
365
2019from 1 Feb
4.6 GWh
5.8 GWh
2%
334
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its one unit, E_POTES-1, fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Port of Tyne
Port of Tyne is a battery storage site at the Port of Tyne in South Shields. It began operating in July 2018.
Its 35 MW of registered generating capacity is spread across one balancing mechanism unit.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.
Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.
Where Port of Tyne is. From its REPD location. Map outline: Natural Earth.
Type
Battery storage
Registered capacity
35 MW
Operational since
July 2018 (REPD)
Area
Tyne and Wear
Location
At the Port of Tyne in South Shields 54.977° N, 1.456° W
Operator in REPD
Foresight (REPD)
Elexon lead party
Arenko Cleantech Limited
BM unit
E_POTES-1 35 MW
Size
66th largest of the 79 battery storage sites on GridMonkey's list
Every finished UK day GridMonkey has recorded for Port of Tyne, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Port Of Tyne Battery Storage: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/port-of-tyne/ (Accessed: [date]).