Pillswood battery storage

Pillswood is a 100 MW battery storage site near Cottingham in the East Riding of Yorkshire, operated or mostly owned by Foresight Group. In 2025 it supplied 69.6 GWh and took 80.6 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since November 2022.

Checking Elexon for Pillswood's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Pillswood since 2022: every month and year

Elexon's metered record for Pillswood's units starts on 18 November 2022, and runs to 24 October 2026. In that time it has supplied 261 GWh and taken 302 GWh while charging, giving back 86% of what it took. Its busiest whole year was 2025, at a load factor of 8%. Its best day was 4 April 2026, when it supplied 466 MWh, 19 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 100 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Pillswood's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct68.9 GWh79.3 GWh10%297
202569.6 GWh80.6 GWh8%356
202460.5 GWh70.3 GWh7%366
202358.6 GWh67.8 GWh7%365
2022from 18 Nov3.2 GWh3.7 GWh3%29

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 2 units (E_PILLB-1, E_PILLB-2), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Pillswood

Pillswood is a battery storage site near Cottingham in the East Riding of Yorkshire. It began operating in November 2022.

Its 100 MW of registered generating capacity is spread across 2 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Pillswood
Where Pillswood is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity100 MW
Operational sinceNovember 2022 (REPD)
AreaEast Riding of Yorkshire
LocationNear Cottingham in the East Riding of Yorkshire
53.801° N, 0.415° W
Owner or operatorForesight Group
Elexon lead partyBP Gas Marketing Limited
BM units E_PILLB-1 50 MW, E_PILLB-2 50 MW
Size17th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Pillswood daily output (CSV)

Every finished UK day GridMonkey has recorded for Pillswood, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Pillswood Battery Storage: Live Output and History Since 2022. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/pillswood/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since November 2022 is its metered output (B1610). Operational date, area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.