Capenhurst battery storage

Capenhurst is a 105 MW battery storage site at Capenhurst, near Ellesmere Port, in Cheshire. In 2025 it supplied 31.6 GWh and took 37.8 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since May 2022.

Checking Elexon for Capenhurst's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Capenhurst since 2022: every month and year

Elexon's metered record for Capenhurst's units starts on 25 May 2022, and runs to 24 October 2026. In that time it has supplied 145 GWh and taken 172 GWh while charging, giving back 84% of what it took. Its busiest whole year was 2024, at a load factor of 5%. Its best day was 22 November 2025, when it supplied 299 MWh, 12 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 105 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Capenhurst's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct20.7 GWh25.2 GWh3%297
202531.6 GWh37.8 GWh3%343
202445.6 GWh52.9 GWh5%366
202341 GWh48.8 GWh4%365
2022from 25 May6 GWh7.3 GWh1%105

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its 4 units (T_PINFB-1, T_PINFB-2, T_PINFB-3, T_PINFB-4), fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Capenhurst

Capenhurst is a battery storage site at Capenhurst, near Ellesmere Port, in Cheshire. It began operating in February 2023. It is one of three batteries at Capenhurst, with Capenhurst Lane and Native River.

Its 105 MW of registered generating capacity is spread across 4 balancing mechanism units. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Capenhurst
Where Capenhurst is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity105 MW
Operational sinceFebruary 2023 (REPD)
AreaCheshire
LocationAt Capenhurst, near Ellesmere Port, in Cheshire
53.257° N, 2.953° W
Operator in REPDZenobē (REPD)
Elexon lead partyZenobe Capenhurst Limited
BM units T_PINFB-1 27 MW, T_PINFB-2 26 MW, T_PINFB-3 26 MW, T_PINFB-4 26 MW
Size13th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Capenhurst daily output (CSV)

Every finished UK day GridMonkey has recorded for Capenhurst, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Capenhurst Battery Storage: Live Output and History Since 2022. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/capenhurst/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since May 2022 is its metered output (B1610). Operator, operational date, area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.