Hunningley Stairfoot battery storage

Hunningley Stairfoot is a 40 MW battery storage site at Stairfoot, near Barnsley, in South Yorkshire, operated or mostly owned by Voltwise. In 2025 it supplied 15.3 GWh and took 18.3 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since June 2022.

Checking Elexon for Hunningley Stairfoot's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Hunningley Stairfoot since 2022: every month and year

Elexon's metered record for Hunningley Stairfoot's unit starts on 30 June 2022, and runs to 24 October 2026. In that time it has supplied 56.3 GWh and taken 67.9 GWh while charging, giving back 83% of what it took. Its busiest whole year was 2024, at a load factor of 5%. Its best day was 27 July 2023, when it supplied 116 MWh, 5 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 40 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Hunningley Stairfoot's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct9.4 GWh11.3 GWh3%286
202515.3 GWh18.3 GWh4%360
202418.7 GWh22.2 GWh5%357
202312.3 GWh15.1 GWh3%301
2022from 30 Jun625 MWh993 MWh0.3%45

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_BARNB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Hunningley Stairfoot

Hunningley Stairfoot is a battery storage site at Stairfoot, near Barnsley, in South Yorkshire.

Elexon registers its one balancing mechanism unit at 44 MW, but Voltwise gives it 40 MW, and that is the capacity this page uses. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Hunningley Stairfoot
Where Hunningley Stairfoot is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Capacity40 MW (Voltwise)
Registered capacity44 MW (Elexon)
AreaSouth Yorkshire
LocationAt Stairfoot, near Barnsley, in South Yorkshire
53.549° N, 1.449° W
Owner or operatorVoltwise
Elexon lead partyEDF Energy Customers Limited
BM unit E_BARNB-1 44 MW
Size62nd largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Hunningley Stairfoot daily output (CSV)

Every finished UK day GridMonkey has recorded for Hunningley Stairfoot, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Hunningley Stairfoot Battery Storage: Live Output and History Since 2022. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/hunningley-stairfoot/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since June 2022 is its metered output (B1610). Area and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.