Hawthorn Pit battery storage

Hawthorn Pit is a 50 MW battery storage site near Murton in County Durham, operated or mostly owned by Foresight Group. In 2025 it supplied 33.6 GWh and took 39 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since August 2024.

Checking Elexon for Hawthorn Pit's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Hawthorn Pit since 2024: every month and year

Elexon's metered record for Hawthorn Pit's unit starts on 30 August 2024, and runs to 24 October 2026. In that time it has supplied 79.6 GWh and taken 92.1 GWh while charging, giving back 86% of what it took. Its best day was 29 March 2026, when it supplied 259 MWh, 11 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 50 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Hawthorn Pit's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct38.4 GWh44.1 GWh11%292
202533.6 GWh39 GWh8%320
2024from 30 Aug7.6 GWh9 GWh4%88

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, 2__FBPGM002, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Hawthorn Pit

Hawthorn Pit is a battery storage site near Murton in County Durham. It began operating in September 2024.

Elexon registers its one balancing mechanism unit at 60 MW, but Harmony Energy gives it 49.9 MW, and that is the capacity this page uses (50 MW to the nearest MW). Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Hawthorn Pit
Where Hawthorn Pit is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Capacity49.9 MW (Harmony Energy)
Registered capacity60 MW (Elexon)
Operational sinceSeptember 2024 (REPD)
AreaCounty Durham
LocationNear Murton in County Durham
54.801° N, 1.394° W
Owner or operatorForesight Group
Elexon lead partyBP Gas Marketing Limited
BM unit 2__FBPGM002 60 MW
Size45th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Hawthorn Pit daily output (CSV)

Every finished UK day GridMonkey has recorded for Hawthorn Pit, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Hawthorn Pit Battery Storage: Live Output and History Since 2024. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/hawthorn-pit/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names, areas and owners or operators come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since August 2024 is its metered output (B1610). Operational date and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every power station in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and which stations are running right now. Free, no sign-up.