Enderby battery storage

Enderby is a 57 MW battery storage site near Leicester. In 2026 so far (to 24 Oct) it supplied 2 GWh and took 3.4 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since March 2025.

Checking Elexon for Enderby's output this half hour…

Generating now
– MW

Loading the live figure from Elexon…

Output over the last 7 days

Loading the last 7 days…

Enderby since 2025: every month and year

Elexon's metered record for Enderby's unit starts on 16 March 2025, and runs to 24 October 2026. In that time it has supplied 2.9 GWh and taken 5.9 GWh while charging, giving back 48% of what it took. Its best day was 10 August 2026, when it supplied 151 MWh, 6 MW on average.

Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 57 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Enderby's metered output by year
YearSuppliedTook while chargingLoad factorDays supplying
2026to 24 Oct2 GWh3.4 GWh0.5%40
2025from 16 Mar885 MWh2.5 GWh0.2%28

Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, T_ENDRB-1, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.

About Enderby

Enderby is a battery storage site near Leicester. It began operating in February 2025.

Its 57 MW of registered generating capacity is spread across one balancing mechanism unit. Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live figure above, and GridMonkey records it every half hour for the chart.

Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.

Enderby
Where Enderby is. From its REPD location. Map outline: Natural Earth.
TypeBattery storage
Registered capacity57 MW
Operational sinceFebruary 2025 (REPD)
AreaLeicestershire
LocationNear Leicester
52.599° N, 1.216° W
Operator in REPDGore Street (REPD)
Elexon lead partyFlexitricity Limited
BM unit T_ENDRB-1 57 MW
Size25th largest of the 79 battery storage sites on GridMonkey's list

Download and cite

Enderby daily output (CSV)

Every finished UK day GridMonkey has recorded for Enderby, up to the last 12 months: the energy it generated, its average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged. The output is what its units told the grid they would generate (their physical notifications), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.

Cite this page (Harvard)

Energycount (2026) Enderby Battery Storage: Live Output and History Since 2025. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/enderby/ (Accessed: [date]).

Other battery storage sites

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Station names and areas come from GridMonkey's own table, matched to the units in Elexon's register; a station's live output and last 7 days here are its physical notifications, not metered generation, and its record since March 2025 is its metered output (B1610). Operator, operational date and location: Renewable Energy Planning Database (REPD) (Department for Energy Security and Net Zero, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.