Bloxwich is a 42 MW battery storage site at Bloxwich, near Walsall, in the West Midlands. In 2025 it supplied 14.4 GWh and took 18.4 GWh while charging. Is it running right now? Its live output from Elexon, the GB electricity market's data service, every half hour of the last week, and every month since February 2019.
Checking Elexon for Bloxwich's output this half hour…
Generating now
– MW
Loading the live figure from Elexon…
Output over the last 7 days
Supplying the grid (above the line)Charging: taking power (below the line)
Elexon's metered record for Bloxwich's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has supplied 84.8 GWh and taken 114 GWh while charging, giving back 74% of what it took. Its busiest whole year was 2020, at a load factor of 4%. Its best day was 23 March 2023, when it supplied 125 MWh, 5 MW on average.
5 MW2.5 MW5 MW taken
20192020202120222023202420252026
Its average output each month, in MW; below the line, what it took from the grid while charging. Its capacity today is 42 MW, well above any month’s average, so the chart is scaled to its months. Hover over or tap a bar for the month’s figures.
Bloxwich's metered output by year
Year
Supplied
Took while charging
Load factor
Days supplying
2026to 24 Oct
9.8 GWh
12.6 GWh
3%
179
2025
14.4 GWh
18.4 GWh
4%
328
2024
13.7 GWh
17.4 GWh
4%
319
2023
11.4 GWh
15 GWh
3%
362
2022
7.4 GWh
10.7 GWh
2%
342
2021
2.3 GWh
5.1 GWh
0.6%
55
2020
14.8 GWh
19.9 GWh
4%
277
2019from 1 Feb
11 GWh
15.3 GWh
3%
305
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation
unit, as settled) for its one unit, E_ARNKB-1, fetched on 2026-11-16. Load factor is against its capacity today, over
the half hours Elexon has figures for; a day counts as one it supplied power on if it supplied at least 2% of its capacity (or 1 MW) in any half hour.
The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Bloxwich
Bloxwich is a battery storage site at Bloxwich, near Walsall, in the West Midlands. It began operating in July 2019.
Its 42 MW of registered generating capacity is spread across one balancing mechanism unit.
Every half hour each unit tells the grid how much it will generate (its physical notification): that is the live
figure above, and GridMonkey has recorded it every half hour since it was added to the list in October 2026, for the chart.
Battery stations charge when power is cheap and plentiful and discharge at the peaks, in seconds. Their output swings between charging and discharging through the day.
Where Bloxwich is. From its REPD location. Map outline: Natural Earth.
Type
Battery storage
Registered capacity
42 MW
Operational since
July 2019 (REPD)
Area
West Midlands
Location
At Bloxwich, near Walsall, in the West Midlands 52.590° N, 2.010° W
Operator in REPD
Gresham House (REPD)
Elexon lead party
Octopus Energy Trading Limited
BM unit
E_ARNKB-1 42 MW
Size
60th largest of the 79 battery storage sites on GridMonkey's list
Every finished UK day GridMonkey has recorded for Bloxwich, up to the last 12 months: the energy it generated, its
average output, load factor and peak, and the hours it ran, and what it took from the grid while it charged.
The output is what its units told the grid they would generate (their physical notifications), not metered
generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column
means.
Cite this page (Harvard)
Energycount (2026) Bloxwich Battery Storage: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/power-stations/bloxwich/ (Accessed: [date]).