Loading the live figure from Elexon…
Output over the last 7 days
Tullo Extension since 2019: every month and year
Elexon's metered record for Tullo Extension's unit starts on 1 February 2019, the start of its archive, and runs to 24 October 2026. In that time it has generated 357 GWh. Its busiest whole year was 2022, at a load factor of 24%. Its best day was 13 February 2021, when it generated 568 MWh, 24 MW on average.
| Year | Generated | Load factor |
|---|---|---|
| 2026to 24 Oct | 40.9 GWh | 23% |
| 2025 | 44.9 GWh | 21% |
| 2024 | 46.4 GWh | 21% |
| 2023 | 38.7 GWh | 18% |
| 2022 | 52.2 GWh | 24% |
| 2021 | 43.7 GWh | 20% |
| 2020 | 47.6 GWh | 22% |
| 2019from 1 Feb | 43 GWh | 21% |
Metered output from Elexon's Balancing Mechanism Reporting Service (B1610, actual generation output per generation unit, as settled) for its one unit, E_TULWW-2, fetched on 2026-11-16. Load factor is against its capacity today, over the half hours Elexon has figures for. The live figure and the last 7 days above are its physical notifications, which GridMonkey records itself.
About Tullo Extension
Tullo Extension is an onshore wind farm in Grampian, Scotland, with 25 MW of registered generating capacity across one balancing mechanism unit. It is the 149th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Eneco. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.
The government's Renewable Energy Planning Database lists Tullo Extension as operational since June 2014, with 10 turbines of 2.5 MW.
| Type | Onshore wind farm |
|---|---|
| Registered capacity | 25 MW |
| Turbines | 10 turbines of 2.5 MW |
| Operational since | June 2014 |
| Location | Grampian, Scotland |
| Grid region | North Scotland |
| Owner group | Eneco (operator or majority owner; joint ventures simplified) |
| Operator in REPD | N R Gammie Partnership |
| Elexon lead party | Eneco Energy Trade |
| BM unit | E_TULWW-2 25 MW |
| Size | 149th largest of 163 |
Download and cite
Tullo Extension daily output (CSV)
Every finished UK day GridMonkey has recorded for Tullo Extension, up to the last 12 months: the energy it generated, its average output and its load factor. The output is what the farm told the grid it would generate (its physical notification), not metered generation. Free to reuse under CC BY 4.0 with credit to GridMonkey: what each column means.
Cite this page (Harvard)
Energycount (2026) Tullo Extension Wind Farm: Live Output and History Since 2019. Available at: https://energycount.co.uk/tools/grid-mix/wind-farms/tullo-extension/ (Accessed: [date]).
Other Eneco wind farms
- Lochluichart onshore, 69 MW
- Moy onshore, 60 MW
- Burn of Whilk onshore, 23 MW
- Tullo onshore, 17 MW
More wind farms in North Scotland
- Mid Hill onshore, 76 MW
- Braes of Doune onshore, 74 MW
- Paul's Hill onshore, 70 MW
- Berry Burn onshore, 63 MW
- Rothes onshore, 55 MW
- Baillie onshore, 53 MW
- Beinn an Tuirc III onshore, 52 MW
- Camster onshore, 50 MW
- Kincardine offshore, 50 MW
- Causeymire onshore, 48 MW
All 163 wind farms, live → Every wind farm on a live map → Wind farm league table → Other power stations, live →
Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's live output and last 7 days here are its physical notifications, not metered generation, and its record since February 2019 is its metered output (B1610). Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.