About Lochluichart

Lochluichart is an onshore wind farm in Highland, Scotland, with 69 MW of registered generating capacity across one balancing mechanism unit. It is the 77th largest of the 163 wind farms in GridMonkey's list of Britain's wind farms that report to Elexon, and is operated or mostly owned by Eneco. Every half hour it tells the grid how much it will generate (its physical notification). That is the live figure above, and GridMonkey has recorded it every half hour since 17 October 2026 for the chart.

The government's Renewable Energy Planning Database lists Lochluichart as operational since May 2014, with 23 turbines of 3 MW.

Lochluichart
Where Lochluichart is, from its REPD location. Map outline: Natural Earth.
TypeOnshore wind farm
Registered capacity69 MW
Turbines23 turbines of 3 MW
Operational sinceMay 2014
LocationHighland, Scotland
Owner groupEneco (operator or majority owner; joint ventures simplified)
Operator in REPDEneco
Elexon lead partyEneco Energy Trade
BM unit T_LCLTW-1 69 MW
Size77th largest of 163

Other Eneco wind farms

Contains BMRS data © Elexon Limited copyright and database right 2026 (licence). Farm names and owner groups are GridMonkey's reading of Elexon's register; a farm's output here is its physical notification, not metered generation. Turbines, location, status and operator: Renewable Energy Planning Database (DESNZ, July 2026). Contains public sector information licensed under the Open Government Licence v3.0.

Every wind farm in Britain, live

GridMonkey shows the whole GB generation mix as one big pie, and every wind farm's output right now. Free, no sign-up.